My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-04-21_REVISION - C1981033
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981033
>
2009-04-21_REVISION - C1981033
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:45:47 PM
Creation date
10/14/2011 10:57:41 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981033
IBM Index Class Name
REVISION
Doc Date
4/21/2009
Doc Name
Preliminary Adequacy Review
From
Susan Burgmaier
To
Joe Dudash
Type & Sequence
SL4
Email Name
JJD
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT IDENTIFICATION <br />Task # : 07b <br />Date : <br />User: <br />04/15/2009 <br />SLB <br />Agency or organization name : CDRMS <br />Permit or other job action :Phase I Bond Release <br />Task description : Rip /scarify replaced topsoil <br />HOURLY EQUIPMENT COST <br />Cost Breakdown : Ownership cost/hour : <br />Dozer operating cost/hour : <br />Ripper operating cost/hour : <br />Operator cost/hour : <br />Total unit cost/hour : <br />MATERIAL QUANTITIES <br />Alternate methods - <br />Seismic : NA <br />Area : <br />7.28 <br />HOURLY PRODUCTION <br />Altemate methods - <br />Seismic : Seismic velocity : <br />Unadjusted production : <br />Area : Avg. ripping depth : <br />Average ripping width : <br />Average ripping length : <br />Average dozer speed : <br />Average maneuver time : <br />Production per unit area : <br />Unadjusted production : <br />JOB TIME AND COST <br />Fleet size : <br />Unit cost : <br />CIRCES Cost Estimating Software <br />BULLDOZER RIPPING WORK <br />State :Colorado <br />County :Gunnison <br />Site : Bear No. 3 <br />Basic machine <br />Blade type <br />Attachment no. 1 <br />Attachment no. 2 <br />NA Load factor : <br />acres Rip depth (ft) : <br />Source of estimated quantity :Division Estimate <br />Source of estimated load factor :NA <br />NA feet/second <br />NA cu. yds. /hour <br />1.00 <br />5.08 <br />100.00 <br />88.00 <br />0.25 <br />0.505 <br />814.28 <br />1 <br />$0.1 <br />feet/pass <br />feet/pass <br />feet/pass <br />feet/minute <br />minutes /pass <br />acres /hour <br />cu. yds. /hour <br />dozer(s) <br />per cu. yd. <br />:Cat D3G XL - 3P <br />:Power Angle Tilt <br />:ROPS Cab <br />:3 -shank ripper <br />$12.77 <br />$21.62 <br />$1.99 <br />$32.78 <br />$69.16 <br />Permit/job # : C- 1981 -033 <br />Abbreviation :none <br />Filename : CO33 -07b <br />Utilization % <br />NA <br />100 <br />100 <br />NA <br />Selected estimating method : Area <br />NA Bank volume : <br />1.00 Volume : <br />Job Condition Correction Factors - <br />Unadjusted production <br />per selected method : <br />Site altitude : <br />Altitude adjustment : <br />Job efficiency factor : <br />Net job correction : <br />Adjusted unit production : <br />Adjusted fleet production : <br />Total job time : <br />Total job cost : <br />Horsepower : 70 <br />Shift basis : 1 per day <br />Data source : (CRG) <br />Total fleet cost/hour : <br />$69.16 <br />NA BCY <br />11,745 BCY or CCY <br />814.28 cu. yds. /hour <br />6,000 <br />1.00 <br />0.83 <br />0.83 <br />675.85 <br />675.85 <br />17.38 <br />$1,202 <br />feet <br />(Cat HB) <br />(1 shift/day) <br />multiplier <br />cu. yds. /hour <br />cu. yds. /hour <br />hours <br />
The URL can be used to link to this page
Your browser does not support the video tag.