Laserfiche WebLink
CIRCES Cost Estimating Software <br />EQUIPMENT MOBILIZATION / DEMOBILIZATION <br />PROJECT IDENTIFICATION <br />Agency or organization name :DRMS <br />State :Colorado <br />County :Mineral <br />EQUIPMENT TRANSPORT RIG COST <br />NON - ROADABLE EQUIPMENT <br />Weight/unit <br />(Tons) <br />Machine <br />Description <br />-Cat 318C L <br />- Generator, diesel - 225 KW <br />- Ventilation equipt <br />Task # : 014 <br />Date : 10/11/2011 <br />User : RCO <br />Permit or other job action :Modification Md -1 <br />Site :Equity Exploration Project <br />Permit/job # :P-2011-010 <br />Abbreviation :none <br />Filename :P010-014 <br />Task description Haul additional reclamation equipment to and from site <br />Truck tractor description <br />Truck trailer description <br />Cost Breakdown : <br />:Generic on- highway truck tractor, 6x4, <br />:Generic folding gooseneck, drop deck <br />Available rig capacities <br />Ownership cost/hour <br />0 -25 Tons <br />$16.63 <br />$44.38 <br />$27.66 <br />$0.00 <br />$88.67 <br />26 -50 Tons <br />$18.37 <br />$46.13 <br />$27.66 <br />$25.39 <br />$117.55 <br />Operating cost/hour : <br />Operator cost/hour : <br />Helper cost/hour : <br />Total Unit Cost/hour : <br />Ownership <br />Cost/hr /unit <br />Haul Rig <br />Cost/hr /unit <br />Fleet Size <br />(No. units) <br />Shift basis : 1 per day <br />Cost data source : CRG Data <br />diesel powered, 400 HP (2nd half, 2006) <br />equipment trailer (25T, 50T, and 100T) <br />Haul Trip <br />Cost/hr /fleet <br />51+ Tons <br />$22.33 <br />$50.07 <br />$27.66 <br />$25.39 <br />$125.45 <br />Return Trip <br />Cost/hr /fleet <br />sheet 1 of 2 <br />21.66 <br />4.00 <br />3.00 <br />$18.70 <br />$6. 79 <br />$10.00 <br />$88.67 <br />$88.67 <br />$88.67 <br />1 <br />1 <br />1 <br />Subtotals : <br />$107.37 <br />$95.46 <br />$98.67 <br />$301.51 <br />$88.67 <br />$88.67 <br />$88.67 <br />$266.01 <br />DOT permit <br />Cost/fleet <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />