Laserfiche WebLink
PROJECT IDENTIFICATION <br />Task # : 013 State :Colorado Permit/job# :P- 2011 -010 <br />Date : 10/11/2011 County :Mineral Abbreviation :none <br />User : RCO Site :Equity Exploration Project Filename :P010-013 <br />Agency or organization name :DRMS <br />Permit or other job action :Modification MD -1 <br />HOURLY EQUIPMENT COST <br />Cost Breakdown : <br />MATERIAL QUANTITIES <br />Initial <br />volume : <br />807 <br />HOURLY PRODUCTION <br />Material consistency description : <br />Partly consolidated stockpile <br />JOB TIME AND COST <br />Fleet size : <br />Unit cost : <br />Task description :Additional pad grading and cover foundation) <br />CCY <br />Source of estimated swell factor :na <br />CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />Basic machine : Cat D6R LGP - 6S (2003) <br />Blade type :Straight <br />Attachment no. 1 :ROPS Cab <br />Attachment no. 2 :NA <br />Ownership cost/hour : <br />Operating cost/hour : <br />Ripper op. cost/hour : <br />Operator cost/hour : <br />Total unit cost/hour : <br />Average push distance : 60 feet <br />Unadjusted hourly production : 409.6 LCY /hr <br />Average push gradient : 0.00 % (pos) <br />Average site altitude : 11,120 feet <br />Material weight : 3,300 Ibs /LCY <br />Weight description : <br />Decomposed rock - 75% Rock, 25% Earth <br />1 Dozer(s) <br />$0.870 /LCY <br />Swell <br />factor : <br />$29.89 <br />$43.48 <br />$0.00 <br />$38.54 <br />$111.91 <br />Source of estimated volume :1 acre x 6 inch avg depth <br />Utilization % <br />NA <br />100 <br />NA <br />NA <br />Horsepower : 185 <br />Shift basis : 1 per day <br />Data source : (CRG) <br />Total fleet cost/hour : $111.91 <br />Loose <br />1.215 volume : 981 LCY <br />Job Condition Correction Factors <br />Operator skill : <br />Material consistency : <br />Dozing method : <br />Visibility : <br />Job efficiency : <br />Spoil pile : <br />Push gradient : <br />Altitude : <br />Material weight : <br />Blade type : <br />Net correction : <br />Adjusted unit production : 128.58 LCY /hr <br />Adjusted fleet production : 128.58 LCY /hr <br />Total job time : <br />Total job cost : $853 <br />Source <br />0.75 (avg.) <br />1.10 (Cat HB) <br />1.00 (gen.) <br />1.00 (avg.) <br />0.83 (lshift/day) <br />0.70 (fnd -mf) <br />1.00 (Cat HB) <br />0.94 (Cat HB) <br />0.70 (Cat HB) <br />1.00 (S /SU /U) <br />0.31 <br />7.63 Hours <br />