Laserfiche WebLink
Build the Best. Be the Best. <br />'. u) 1) 114 <br />October 10, 2010 <br />Division of Reclamation, Mining and Safety <br />Department of Natural Resources <br />Attn: Michael Cunningham <br />1313 Sherman St., Room 215 <br />Denver, CO 80203 <br />Re: Permit No 11-2006 -078 <br />Technical Revision Submission <br />Mr. Cunningham, <br />Flatiron Constructors, Inc. has prepared a Technical Revision to the Reclamation Plan <br />for the Camenish Borrow, Pit Number M- 2006 -078 based up September 1, 2011 <br />Inspection Report. Enclosed is required $216.00 revision fee for the Technical Revision <br />Submission. The Reclamation Plan has been revised to match as- constructed gas well <br />access grading of the pit and location of small aggregate stockpile for the landowner's <br />use with proposed dryland seed mixture has also been included as part of technical <br />revision better suited to landowner's post mining used as range land. Also attached is <br />agreement letter from the property landowner regarding aggregate pile and proposed <br />pond filling plan. <br />Should you require any further information or clarification, please feel free to contact me <br />directly at (720) 494 -8091. <br />Sincerely, <br />FLATIRON CON <br />Justin DuMond PE <br />Project Manager <br />Cc: Job File <br />TORS, INC. <br />1 FLATIRON <br />CCT 221 <br />6 Y/Oft, <br />w Swiay <br />Flatiron Constructors, Inc. <br />10188 E. 1 -25 Frontage Rd <br />Firestone, CO 80504 <br />303 485 4050 MAIN <br />303 485 7684 FAX <br />www.flatironcorp.com <br />An Equal Opportunity Employer A HOCHTIEF Company <br />