My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-10-11_REVISION - M1981185
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1981185
>
2011-10-11_REVISION - M1981185
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:58:22 PM
Creation date
10/12/2011 9:21:34 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981185
IBM Index Class Name
REVISION
Doc Date
10/11/2011
Doc Name
Response to 6th adequacy letter to CN-01
From
GreenbergTraurig for Wildcat Mining Corporation
To
DRMS
Type & Sequence
CN1
Email Name
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Wallace H. Erickson <br />Response to September 28, 2011 Cazier Memorandum <br />October 11, 2011 <br />Page 6 <br />• In order to confirm the capacity of the La Plata River Bridge in its current <br />configuration, and to assess the need for any improvements to the bridge, <br />Wildcat will implement a geotechnical work plan consisting of performing a <br />review of existing data, subsurface investigation, laboratory testing, <br />engineering analysis, conclusions regarding bridge capacity, and design <br />criteria recommendations. Specifically, Wildcat will perform the following: <br />DEN 97,629,168v1 10 -11 -11 <br />o Drill two test borings to 20 feet or refusal at the abutments of the <br />bridge. Our engineer /geologist will log the borings and obtain <br />relatively undisturbed, bulk samples of the materials encountered. <br />Samples will be inspected to confirm field classifications and for <br />laboratory testing; <br />o Selected samples will be transported for laboratory testing <br />including moisture content, dry density, strength, classification, <br />grain -size distribution, and compaction tests; <br />o Perform engineering and geologic evaluations to develop <br />conclusions and recommendations regarding the following: <br />• Capacity of bridge and abutments; <br />• Design for bridge improvements, as necessary, <br />accommodate load bearing necessary for proposed mining <br />operations. <br />o Prepare a technical memorandum summarizing the results of the <br />work described above. <br />o Submit design for bridge improvements to DRMS, as necessary, <br />pursuant to the Technical Revision or Amendment process. <br />o After obtaining DRMS approval through the Technical Revision <br />or Amendment process, proceed with remainder of work plan. <br />Response to Adequacy Issue No. 7.b. <br />Wildcat as deleted the first bullet. <br />Response to Adequacy Issue No. 7.c. <br />Wildcat will replace the bullets in the "La Plata River Bridge" section at Page 9 <br />of Exhibit 6.5 with the revised bullets shown supra in Response to Adequacy Issue No. <br />7.a. <br />GREENBERG TRAURIG, LLP a ATTORNEYS AT LAW ® WWW.GTLAW.COM <br />
The URL can be used to link to this page
Your browser does not support the video tag.