My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-10-11_REVISION - M1981185
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1981185
>
2011-10-11_REVISION - M1981185
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:58:22 PM
Creation date
10/12/2011 9:21:34 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981185
IBM Index Class Name
REVISION
Doc Date
10/11/2011
Doc Name
Response to 6th adequacy letter to CN-01
From
GreenbergTraurig for Wildcat Mining Corporation
To
DRMS
Type & Sequence
CN1
Email Name
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Wallace H. Erickson <br />Response to September 28, 2011 Cazier Memorandum <br />October 11, 2011 <br />Page 2 <br />Wildcat will also modify the bullet it added at Page 4 of Attachment D -2 in it <br />Response to Adequacy Issue No. 2, August 19, 2011 Cazier Memorandum, as follows: <br />• Submit revised design plans for portal stabilization, showing the location of <br />the point of contact of the unconsolidated material and bedrock, and <br />including repair drawings and specifications, as necessary, through the <br />Technical Revision or Amendment process; <br />Adequacy Issue No. 2. <br />The applicant has committed to resolving this adequacy issue. However, they have not <br />committed to addressing this adequacy issue in a TR or AM. Please provide a written <br />commitment to resolve this adequacy issue via the TR or AM process. The revised text <br />and five bulleted responses to this adequacy issue presented in the subject response letter <br />shall be included in the revised Geotechnical Stability Exhibit. <br />Response to Adequacy Issue No. 2. <br />Wildcat committed in the fourth and fifth bullets to its Response to Adequacy <br />Issue No. 2, August 19, 2011 Cazier Memorandum, to address this adequacy issue in a <br />Technical Revision or Amendment. See Response to Adequacy Issue No. 2, August 19, <br />2011 Cazier Memorandum. <br />Wildcat will also add the text beginning with the second full paragraph of Page 4 <br />of Attachment D -2 through the end of the "Calculations" section at Page 5 of <br />Attachment D -2, as modified by its Response to Adequacy Issue No. 2, August 19, 2011 <br />Cazier Memorandum, into the text at Page 3 of Exhibit 6.5, after the second full <br />paragraph in the, "May Day No. 1 Portal collapse and head scarp stabilization" section. <br />Immediately following this addition, Wildcat will add a sentence stating: "Wildcat <br />incorporates by reference herein the remainder of Attachment D -2." <br />Adequacy Issue No. 3. <br />The response to this issue is considered adequate. <br />Response to Adequacy Issue No. 3. <br />No response to Adequacy Issue No. 3 is required. <br />Adequacy Issue No. 4. <br />This response is inadequate. DRMS has previously reviewed the May 29, 2010 report <br />and found it to be inadequate. <br />DEN 97,629,168v1 10 -11 -11 <br />GREENBERG TRAURIG, LLP ® ATTORNEYS AT LAW ® WWW.GTLAW.COM <br />
The URL can be used to link to this page
Your browser does not support the video tag.