My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-10-11_REVISION - M1981185
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1981185
>
2011-10-11_REVISION - M1981185
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:58:22 PM
Creation date
10/12/2011 9:21:34 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981185
IBM Index Class Name
REVISION
Doc Date
10/11/2011
Doc Name
Response to 6th adequacy letter to CN-01
From
GreenbergTraurig for Wildcat Mining Corporation
To
DRMS
Type & Sequence
CN1
Email Name
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Wallace H. Erickson <br />Response to September 27, 2011 Cazier Memorandum <br />October 11, 2011 <br />Page 11 <br />Response to Adequacy Issue No. 17.b. <br />Wildcat will change this reference to "3(H):1(V)." <br />Response to Adequacy Issue No. 17.c. <br />Wildcat will change the reference from "Detailed drawings" to "Conceptual <br />drawings," and the reference from "Figure D -1" to "Figure D -2." <br />Response to Adequacy Issue No. 17.d. <br />Wildcat will change this reference to Figure D -2. <br />Adequacy Issue No. 18. <br />The applicant has committed to resolving this adequacy issue. However, they have not <br />committed to addressing this adequacy issue in a TR or AM. Please provide a written <br />commitment to resolve this work plan adequacy issue via the TR or AM process. <br />Response to Adequacy Issue No. 18. <br />Wildcat has committed to installing the four- and 12 -inch HDPE pipe in the <br />same trench at a depth of not less than four feet to prevent pipe freezing. Wildcat will <br />add an item after Item 15, as follows: "In the event data obtained during implementation <br />of Attachment D -6 demonstrate modifications to this design are necessary, Wildcat will <br />submit such modified designs to DRMS for review and approval through the Technical <br />Revision or Amendment process." <br />Adequacy Issue No. 19. <br />The applicant has committed to resolving this adequacy issue. However, they have not <br />committed to addressing this adequacy issue in a TR or AM. Please provide a written <br />commitment to resolve this work plan adequacy issue via the TR or AM process. <br />Response to Adequacy Issue No. 19. <br />Wildcat will add a bullet to the "Reporting" section at Page 6 of Attachment D- <br />6 as follows: "In the event information obtained through the daily reporting process <br />demonstrates modifications are necessary to the design of the augmentation pond, <br />Wildcat will submit such design modifications to DRMS for review and approval <br />through the Technical Revision or Amendment process." <br />DEN 97, 627, 904v1 10 -11 -11 <br />GREENBERG TRAURIG, LLP ® ATTORNEYS AT LAW ® WWW.GTLAW.COM <br />
The URL can be used to link to this page
Your browser does not support the video tag.