My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-10-11_REVISION - M1981185
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1981185
>
2011-10-11_REVISION - M1981185
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:58:22 PM
Creation date
10/12/2011 9:21:34 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981185
IBM Index Class Name
REVISION
Doc Date
10/11/2011
Doc Name
Response to 6th adequacy letter to CN-01
From
GreenbergTraurig for Wildcat Mining Corporation
To
DRMS
Type & Sequence
CN1
Email Name
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Wallace H. Erickson <br />Response to September 27, 2011 Cazier Memorandum <br />October 11, 2011 <br />Page 8 <br />does not show any catch basin. Please provide the location of the catch basin. (Note <br />the proximity of the Forest Service Boundary may impact the location of some <br />BMPs.) <br />c. Please show ditch "DD" draining to the catch basin instead of the augmentation <br />pond crest and ensure its alignment promotes positive drainage. <br />d. The augmentation pond will contain potentially impacted water. As such, <br />stormwater cannot be allowed to mix with the water in the pond. Please <br />demonstrate how run -on from the hill on the east side of the pond will be <br />diverted away from the pond. <br />Response to Adequacy Issue No. 12. <br />Response to Adequacy Issue No. 12.a. <br />Wildcat is submitting a revised Attachment D -6, Figure D -2 showing wattle <br />locations. See Ex. 7. <br />Response to Adequacy Issue No. 12.b. <br />Wildcat is submitting a revised Attachment D -6, Figure D -2 showing the location <br />of the catch basin. See Ex. 7. <br />Response to Adequacy Issue No. 12.c. <br />Revised Attachment D -6, Figure D -2 shows ditch "DD" draining to the catch <br />basin instead of the augmentation pond crest and demonstrates an alignment promoting <br />positive drainage. See Ex. 7. <br />Response to Adequacy Issue No. 12.d. <br />Wildcat has included run -on controls in its revised Attachment D -6, Figure D -2 <br />to demonstrate how run -on from the hill on the east side of the pond will be diverted <br />away from the pond. See Ex. 7. <br />Adequacy Issue No. 13. <br />The response is inadequate. The applicant references Attachment 8 for a general <br />description for the installation of the keyway and liner. Attachment 8 includes no <br />description, only a photo from Flickr® photo sharing website titled "12 -31 -08 Pond dam <br />keyway" with this comment underneath: "This is all trial and error. I know what needs to <br />be done, but ... ". There is no mention of a liner. Furthermore, the "trial and error" <br />comment does not instill confidence in the DRMS engineering staff that the applicant <br />can properly design and install the keyway and liner for the augmentation pond. Please <br />provide the previously requested conceptual detail. This would typically include a <br />DEN 97, 627, 904v1 10 -1141 <br />GREENBERG TRAURIG, LLP o ATTORNEYS AT LAW ® WWW.GTLAW.COM <br />
The URL can be used to link to this page
Your browser does not support the video tag.