My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-10-11_REVISION - M1981185
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1981185
>
2011-10-11_REVISION - M1981185
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:58:22 PM
Creation date
10/12/2011 9:21:34 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981185
IBM Index Class Name
REVISION
Doc Date
10/11/2011
Doc Name
Response to 6th adequacy letter to CN-01
From
GreenbergTraurig for Wildcat Mining Corporation
To
DRMS
Type & Sequence
CN1
Email Name
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Wallace H. Erickson <br />Response to September 27, 2011 Cazier Memorandum <br />October 11, 2011 <br />Page 2 <br />response to this adequacy issue presented in the subject response letter shall be included <br />in the revised Work Plan. <br />Response to Adequacy Issue No. 2. <br />As explained in Response to Adequacy Issue No. 1, August 22, 2011 Cazier <br />Memorandum, Wildcat will submit any revised Portal Collapse Work Plan for DRMS <br />review and approval through the Technical Revision or Amendment process. The <br />"Reporting" section at Page 8 of Attachment D -2 also speaks to a geotechnical engineer <br />recommending corrective action repairs in the event movement thresholds are exceeded. <br />Wildcat will add a sentence to the "Implementation Post Construction Monitoring <br />Program" section at Page 7 -8 of Attachment D -2 explaining that any corrective action <br />design will be submitted to DRMS for review and approval through the Technical <br />Revision or Amendment process. The remainder of "Reporting" section at Page 8 of <br />Attachment D -2 deals with providing as -built drawings to DRMS after completion of the <br />Attachment D -2 work plan. Wildcat does not believe a Technical Revision is necessary <br />to provide as built drawings. <br />Adequacy Issue No. 3. <br />a. The new Attachment D -2, Figure D -2 (dated 9/7/2011) and the provided narrative <br />are considered adequate for the response to Adequacy Issue No. 3a. <br />b. This has not been corrected on the revised drawing (Attachment D -2, Figure D -2 <br />(dated 9/7/2011). The south diversion ditch in the plan view flowing north towards <br />the sediment basin still appears to flow uphill, gaining five feet in elevation. Please <br />revise the grading plan to demonstrate positive drainage to the sediment basin. <br />Response to Adequacy Issue No. 3. <br />Response to Adequacy Issue No. 3.a. <br />No response is necessary for Adequacy Issue No. 3.a. <br />Response to Adequacy Issue No. 3.b. <br />Wildcat submitted a revised Attachment D -2, Figure D -2 showing positive ditch <br />drainage to the sediment basin in its Supplemental Response to Fifth Adequacy on <br />September 28, 2011.. <br />Attachment D -3, Little Deadwood Gulch May Day No. 2 Drainage Control <br />Adequacy Issue No. 4. <br />The applicant has committed to resolving this adequacy issue. However, they have not <br />committed to addressing this adequacy issue in a TR or AM. Please provide a written <br />DEN 97,627,904v1 10 -11 -11 <br />GREENBERG TRAURIG, LLP ® ATTORNEYS AT LAW ® WWW.GTLAW.COM <br />
The URL can be used to link to this page
Your browser does not support the video tag.