GENERAL PROJECT ITEMS <br />Summary of Concerns: <br />No concerns <br />Summary of Planning Items: <br />Continue subgrade acceptance prior to SLF placement within the Phase 5 VLF. <br />Continue slope contouring and subgrade preparation within the Phase 5 VLF. <br />Continue SLF placement within the Phase 5 VLF <br />Continue subgrade acceptance prior to geomembrane deployment within Phase 5 VLF. <br />Continue geomembrane installation within Phase 5 VLF. <br />Continue obtaining samples and assisting in the process of DCF material at the DCF Process area. <br />Continue excavation and backfill of the existing (temporary) anchor trench within the Phase 5 VLF. <br />Continue geomembrane exposure within the Phase 5 VLF. <br />Continue installation of the high volume solution collection system within the Phase 5 VLF. <br />Continue DCF placement within the Phase 5 VLF. <br />Continue leak detection system installation within the Phase 5 VLF. <br />Continue 80mi1 primary geomembrane acceptance within the Phase 5 VLF. <br />Summary of Non - conformances: <br />None Issued <br />Summary of Meetings and Discussions: <br />CC &V :: <br />CC &V held a weekly construction meeting on September 20, 2011. Items discussed included Safety, <br />Environmental, Schedule, QC documentation, and CQA. <br />Ames Construction: <br />None <br />AMEC: <br />Kim Morrison (AMEC- Project Sponsor) was onsite to observe site activities, progress, and scheduling. <br />Summary of Incidents /Accidents /Health & Safety Issues: <br />None <br />We trust the information provided clearly represents our findings and observations for the week ending <br />September 24, 2011. <br />Joseph Hickey, CQA Monitor Date: September 24, 2011 <br />Date: <br />9 /X/ 1 <br />VLF Weekly Report WE 09.24.2011 <br />