Weekly Construction Quality Assurance ("CQA") Reports: Weeks of 9/10, 9/17, and 9/24/2011.
From
CC&V
To
DRMS
Type & Sequence
AM9
Email Name
BMK
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Location <br />This Week <br />(tons) <br />Cumulative <br />(tons) <br />Comments <br />DCF Process <br />38,299 <br />355,421 <br />Total <br />38,299 <br />355,421 <br />ame <br />achieved using a CAT 563 vibratory smooth drum compactor with a minimum of 4- passes. <br />The area was remediated in accordance with project design drawings and specifications. <br />II) Storm Water Management <br />A) Best Management Practices <br />Best Management Practices are being observed throughout the Phase 5 VLF Project. <br />III) Material Processing <br />A) Drain Cover Fill Process Area <br />Processing of Drain Cover Fill (DCF) continued at the DCF process area using a CAT dozer. <br />C) Geomembrane Exposure <br />1) VLF <br />No work performed during the week. <br />VLF Geosynthetics <br />B) Geomembrane Installation <br />1) VLF <br />Geomembrane installation within the Phase 5 VLF resumed performing deployment, seaming, <br />and repair /QC activities. Geomembrane installation was performed in the area shown on <br />Figure 3. Approximately 425,278 square feet of 80mil LLDPE was deployed using a Komatsu <br />200 excavator and a John Deere 544 front -end loader with spreader -bar attachments. Subgrade <br />was inspected and approved by AMEC and Lonestar representatives prior to geomembrane <br />deployment (see Figure 3). Approximately 20,873 linear feet of seam was fusion welded using <br />three fusion welding machine /welding technician combinations. Forty -six destructive test <br />samples were marked during fusion seaming. Approximately 1,351 linear feet of seam was <br />extrusion welded using one extrusion welding machine /welding technician combinations. Five <br />destructive test samples were marked during extrusion seaming. All destructive tests performed <br />were within project specifications. Non - destructive testing was performed for fusion welded <br />seams. Repairs were performed using the extrusion welding method for all marked defects. <br />Vacuum testing was performed for all extrusion welded seams and repairs. <br />During the Cresson blast, an AMEC field representative observed the geomembrane and no <br />damage was noted. <br />D) Anchor Trench <br />1) VLF <br />Anchor trench excavation continued between stations A5 +50 ( + / -) and A8 +30 ( + / -), near <br />centerline, and between stations J21 +50 ( + / -) and J29 +00 ( + / -), near centerline, using a John <br />Deere 35D excavator and one laborer. The anchor trench was inspected by an AMEC field <br />VLF Weekly Report WE 09.24.2011 <br />
The URL can be used to link to this page
Your browser does not support the video tag.