Laserfiche WebLink
NPDES basins. SCC has weekly safety and communications meeting and annual safety <br />• and operations retraining. <br />• <br />35: See application form and Item 15. <br />36: See introduction items on pages 1 and 2 of this document. <br />37 to 39: See application form <br />40. This facility will not discharge directly into a ditch or storm sewer. The application <br />is not clear if a signature is needed in this case. If the Division requires a signature in this <br />case, one will be provided to the Division. <br />This concludes SCC's discussion of the permit application. Please feel free to contact <br />me, at the address listed on the cover page, or email djones @peabodyenergy.com, or at <br />970 - 276 -5209 (my direct phone line), for any questions you may have. <br />Sincerely, <br />Dennis Jones <br />Hydrologist I <br />