Laserfiche WebLink
Design Criteria <br />Topic <br />Design Criteria for the Proposed Action <br />Erosion & Sediment <br />Control <br />78. Erosion will be minimized through interim reclamation including, <br />but not limited to, contouring, seedin g and mulching. <br />79. Sediment control measures such as, but not limited to, silt fence, <br />straw mulch, site containment and sediment control ponds will be <br />utilized as needed. <br />BMP <br />BMP <br />Incidental Coal <br />Recovery <br />80. Any coal recovered incidental to project will be taken back to the <br />mine site or disposed of in the mud pits. <br />MCC Project <br />Plan <br />AIR QUALITY <br />Surface Air Quality <br />81. Road watering and/or treatment with dust suppressant on the <br />access road during the short -term construction and development <br />activities will minimize vehicle - related fugitive dust emissions. <br />82. To the extent feasible, project workers would car pool to and from <br />the project area to minimize vehicle - related emissions and fugitive <br />dust emissions. <br />BMP <br />BMP <br />RECREATION <br />Recreation <br />83. To avoid near -miss accidents between hunters and drillers, MCC <br />will be encouraged to avoid operations on Minnesota Creek Road <br />from the Thursday before the second hunting season opener (mid- <br />October) to the Wednesday after the second hunting season <br />opener. If use is required for operations using over -sized vehicles <br />during any period of public use, then MCC will use appropriate <br />active traffic control measures. <br />CDOW <br />suggestion <br />CULTURAL RESOURCES <br />Cultural Surveys/ <br />Paleontological <br />Resources <br />84. Prior to the construction process, an intensive cultural resources <br />survey would be completed by the Proponent, at their expense, on <br />all areas proposed for surface disturbance if it has not already <br />been inventoried per requirements of the Standard Notice for <br />Lands Under Jurisdiction of the USDA attached to the leases. <br />85. During project imple mentation, in the event of an inadvertent <br />discovery of any other cultural resources not covered under <br />NAGPRA (above), work should cease and an archaeologist <br />should be notified to investigate the resource. Any cultural <br />resources located will be brought to the immediate attention of the <br />Forest Service and will be left intact until directed to proceed. All <br />data and materials recovered will remain under the jurisdiction of <br />the U.S. Government <br />43 CFR 7 <br />Subtitle A and <br />36 CFR Part <br />296 <br />43 CFR 7 and <br />36 CFR Part <br />296 <br />CONSTRUCTION ACTIVITIES <br />Interim reclamation <br />86. Interim reclamation will be done through seeding of ungraveled <br />areas. <br />BMP, State <br />