My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-09-19_PERMIT FILE - M2011040
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2011040
>
2011-09-19_PERMIT FILE - M2011040
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2020 9:14:21 AM
Creation date
10/7/2011 1:48:01 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2011040
IBM Index Class Name
PERMIT FILE
Doc Date
9/19/2011
Doc Name
Proposed plan of operation
From
Rimrock Exploration and Development, Inc.
To
USBLM Uncompahgre Field Office
Email Name
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task Roll -up <br />Task Roll -up Cost <br />Reclaim Roadways <br />2,310.00 <br />Reclaim Waste Rock Piles <br />8,570.00 <br />Reclaim Decline Portal <br />1,560.00 <br />Reclaim Ore Storage and Handling Area <br />4,630.00 <br />Reclaim Ventilation Borehole <br />9,380.00 <br />Reclaim Water Drop <br />130.00 <br />Reclaim Surface Water Control & Containment Structures <br />7,300.00 <br />Remove Underground & Surface Equipment and Structures <br />5,360.00 <br />Task Roll -up Total <br />$39,240.00 <br />Administration @ 10% <br />3,924.00 <br />Contingency @ 15% <br />6,475.00 <br />Reclamation 3 Party Cost Total <br />$49,639.00 <br />DRMS Administration Cost @ 5% <br />2,482.00 <br />Total Reclamation Cost Estimate <br />$52,121.00 <br />Prince Albert Mine Plan of Operations Reclamation'Plan <br />5.12 Reclamation Costs <br />A summary table of the estimated costs associated with the reclamation of the Prince Albert Mine site <br />is provided in Table 7 "Summary Reclamation Cost Estimate" below. <br />This reclamation cost is very conservative and a planning estimate only based on a third -party <br />contractor performing the work. Actual costs are anticipated to be 25% to 50% lower since some <br />reclamation work will be performed on an ongoing basis during the mining operation, particularly <br />with regards to the waste pile reclamation. Note that the seeding cost /acre assumes that 50% of the <br />areas will have to be reseeded. <br />Estimated costs associated with the reclamation of the Prince Albert Mine site are provided below. <br />The final reclamation costs, for bonding purposes, will be calculated by the DRMS once that agency <br />has reviewed the Reclamation Plan prior to issuing a Limited Impact 110(d) Mining Reclamation <br />Permit. <br />Rimrock Exploration and Development <br />Table 7 <br />Summary Reclamation Cost Estimate <br />Page 23 of 27 <br />
The URL can be used to link to this page
Your browser does not support the video tag.