Laserfiche WebLink
Description <br />Months <br />Access and mine the Prince Albert ore deposit. <br />120.0 <br />Post Mining Site Reclamation <br />Reclaim the Ore Pad Area <br />0.25 <br />_ <br />Reclaim the Prince Albert Decline Portal <br />0.25 <br />Reclaim the Ventilation Shaft(s) <br />0.75 <br />Dismantle and Remove Structures <br />0.50 <br />Reclaim Storm Water Diversions / Structure s(C o ncurrent w/ Waste Piles) <br />(0.25) <br />Reclaim Waste Piles <br />0.50 <br />Rip the Prince Albert Portal Area and Site Access Roads <br />0.25 <br />Place Topsoil and Harrow <br />0.50 <br />Seed and Mulch <br />0.50 <br />Monitor Vegetation and Re -seed, as necessary (based on the standard <br />DRMS monitoring period of three years post- seeding). <br />36.0 <br />Total Reclamation Period (months) <br />39.5 <br />Prince Albert Mine Plan of Operations Reclamation Plan <br />5.0 RECLAMATION PLAN <br />This section of the Plant of Operations describes the post- mining land use, site reclamation timetable, <br />location specific reclamation of site features that are not related to toxic materials, and a conservative <br />reclamation cost estimate associated with returning the affected lands to the post- mining land use. A <br />map of the site that depicts the post - reclamation features of the site is attached as Figure 4 <br />"Reclamation Plan Map." <br />A detailed discussion of the reclamation required for each specific location on the site that may be <br />affected by toxic, or potentially toxic, materials is included in the attached DRMS Limited Impact <br />110(d) Mining Reclamation Permit application Exhibit U "Environmental Protection Plan (EPP)." <br />5.1 Post Mining Land Use <br />The Prince Albert Mine site will be reclaimed as dry rangeland and wildlife habitat. <br />5.2 Reclamation Timetable <br />A timetable for the commencement and completion of reclamation is provided below. Reclamation <br />under this plan is not staged and occurs at the end of the mine life. <br />Rimrock Exploration and Development <br />Table 5 <br />Prince Albert Reclamation Timetable <br />Page 19 of 27 <br />