Laserfiche WebLink
250 gal Used Oil Tank <br />1 <br />Access Road Gate <br />1 <br />400 gal. Livestock Tank <br />(Oil Tank Containment) <br />1 <br />20ft x 8ft x 8ft Container <br />(Wind- and - Watertight) <br />2 <br />Shop /Storage /Office <br />500 gal. Diesel Fuel Tank <br />2 <br />Portable Toilet <br />1 <br />650 gal. Livestock Tank <br />(Fuel Tank Containment) <br />2 <br />Crew Transport/Utility <br />Truck <br />2 <br />Explosives Magazine <br />3 <br />Skidsteer Loader <br />2 <br />375 -900 CFM Compressor <br />2 <br />3 -4 yd Rubber Tire Loader <br />1 <br />Diesel Powered Generator <br />2 <br />Medium Size Bulldozer <br />1 <br />Potable Water Tank <br />1 <br />Motor Grader <br />1 <br />Operations Water Tank <br />1 <br />Surface Drill Rig <br />1 <br />Water Truck <br />1 <br />Prince Albert Mine Plan of Operations 110(d) Operation Description <br />4.1.8 Surface Structures and Equipment <br />Support structures and equipment used in the surface operations of Prince Albert Mine will be <br />portable and stored on the surface. This equipment is typical in the support of a small mining <br />operation. These structures and equipment may include the items listed in Table 3A. <br />Surface Equipment <br />Rental/ Contracted Equipment <br />Table 3A <br />Surface Equipment / Structures <br />Number of Pieces 1 Surface Eauipment <br />Number of Pieces <br />Number of Pieces <br />1 -3 <br />125 t Highway Haul Trucks <br />4.1.9 Processing Facilities <br />There will be no processing facilities on site. All mine -run ore will be loaded into trucks and <br />transported to one of the milling facilities described under Section 4.1.2 "Ore Transportation." <br />4.1.10 Water Supply <br />Untreated well water from a private source will be used for mining operations. The water will be <br />trucked in and stored in one or more 500 to 1000 gallon tanks. As underground development <br />progresses, a water drop will be installed southeast of the decline (see Figure 3 "Mine Plan Site <br />Map "). This water drop will consist of a 500 to 1000 gallon tank feeding water to the underground <br />workings through a piping system installed down an existing surface exploration drill hole. The tank <br />will be located on the surface within a bermed area for spill containment and runoff control. <br />Potable water will be supplied in individual containers for human consumption. <br />Rimrock Exploration and Development Page 15 of 27 <br />