My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-10-04_PERMIT FILE - P2011018
DRMS
>
Day Forward
>
Permit File
>
Prospect
>
P2011018
>
2011-10-04_PERMIT FILE - P2011018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:43:46 PM
Creation date
10/7/2011 1:24:50 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2011018
IBM Index Class Name
PERMIT FILE
Doc Date
10/4/2011
Doc Name
Review complete & reclamation liability estimate
From
DRMS
To
Gault Group, LLC
Email Name
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Loader Worksheet Cont'd Task # 02A Page 2 of 2 <br />Return Route: I 25 <br />Load Bucket Capacity <br />Rated Capacity: 1.50 LCY (heaped) <br />Bucket Fill Factor: 1.025 Rock - Earth Mixture (100 % -105 %) 1.025 <br />Adjusted Capacity: 1.54 LCY <br />Job Condition Correction Factors <br />Site Altitude: 10700 feet <br />Altitude Adj: <br />Job Efficiency: <br />Net Correction: <br />0.83 <br />0.83 <br />0.69 <br />0.00 <br />Source <br />(CAT HB) <br />(1 shift/day) <br />multiplier <br />4.00 4.00 <br />Total Travel Time: <br />Total Cycle Time: <br />Unadjusted Hourly Unit Production: 175.14 LCY/Hour <br />Adjusted Hourly Unit Production: 120.65 LCY/Hour <br />Adjusted Hourly Fleet Production: 120.65 LCY/Hour <br />0.0159 1 (Cat HB) <br />0.0317 <br />0.5267 <br />minutes <br />minutes <br />JOB TIME AND COST <br />Fleet size: 1 Loader(s) Total job time: 4.83 Hours <br />Unit cost: $0.681 /LCY Total job cost: $397.00 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.