Laserfiche WebLink
Loader Worksheet Cont'd Task # 02A Page 2 of 2 <br />Return Route: I 25 <br />Load Bucket Capacity <br />Rated Capacity: 1.50 LCY (heaped) <br />Bucket Fill Factor: 1.025 Rock - Earth Mixture (100 % -105 %) 1.025 <br />Adjusted Capacity: 1.54 LCY <br />Job Condition Correction Factors <br />Site Altitude: 10700 feet <br />Altitude Adj: <br />Job Efficiency: <br />Net Correction: <br />0.83 <br />0.83 <br />0.69 <br />0.00 <br />Source <br />(CAT HB) <br />(1 shift/day) <br />multiplier <br />4.00 4.00 <br />Total Travel Time: <br />Total Cycle Time: <br />Unadjusted Hourly Unit Production: 175.14 LCY/Hour <br />Adjusted Hourly Unit Production: 120.65 LCY/Hour <br />Adjusted Hourly Fleet Production: 120.65 LCY/Hour <br />0.0159 1 (Cat HB) <br />0.0317 <br />0.5267 <br />minutes <br />minutes <br />JOB TIME AND COST <br />Fleet size: 1 Loader(s) Total job time: 4.83 Hours <br />Unit cost: $0.681 /LCY Total job cost: $397.00 <br />CIRCES Cost Estimating Software <br />