My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-10-04_PERMIT FILE - P2011018
DRMS
>
Day Forward
>
Permit File
>
Prospect
>
P2011018
>
2011-10-04_PERMIT FILE - P2011018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:43:46 PM
Creation date
10/7/2011 1:24:50 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2011018
IBM Index Class Name
PERMIT FILE
Doc Date
10/4/2011
Doc Name
Review complete & reclamation liability estimate
From
DRMS
To
Gault Group, LLC
Email Name
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cycle Time Factors <br />Factor (min.) <br />Source <br />Material: <br />Mixed material 0.02 <br />0.020 <br />(Cat HB) <br />Stockpile: <br />No adjustment - factor not applicable 0.00 <br />0.000 <br />(Cat HB) <br />Truck Ownership: <br />No adjustment - factor not applicable 0.00 <br />0.000 <br />(Cat HB) <br />Operation: <br />No adjustment - factor not applicable 0.00 <br />0.000 <br />(Cat HB) <br />Dump Target: <br />No adjustment - factor not applicable 0.00 <br />0.000 <br />(Cat HB) <br />Task description: Road berms and misc, earth work <br />Tomichi Creek Exploration <br />Site: Project <br />PROJECT IDENTIFICATION <br />Task #: 02A State: Colorado <br />Date: 10/4/2011 County: Gunnison <br />User: GRM <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Attachment 1: <br />Cost Breakdown: <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Operator Cost/Hour: <br />Total Unit Cost/Hour: <br />Total Fleet Cost/Hour: $82.22 <br />MATERIAL QUANTITIES <br />Initial volume: 500 <br />Loose volume: <br />HOURLY PRODUCTION <br />Loader Cycle Time: <br />Haul and Return Time <br />Haul Route: <br />WHEEL LOADER - LOAD AND CARRY WORK <br />CAT 446B (2004) <br />ROPS Cab <br />Length <br />(feet) <br />583 <br />Permit Action: <br />$18.49 <br />$25.24 <br />$38.49 <br />$82.22 <br />Grade Res. <br />( %) <br />*OVER <br />CCY <br />LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />2011 Initial <br />Reclamation Liability <br />Estimate <br />Utilization % <br />NA <br />100 <br />NA <br />Swell factor: 1.165 <br />Unadjusted Basic Cycle Time (load, dump, maneuver): <br />Net Cycle Time Adjustment: <br />Adjusted Basic Cycle Time: 0.495 <br />Rolling Resistance — Road Conditions <br />Haul: Rutted dirt, little maintenance, no water, 1" tire penetration 4.0 <br />Return: Rutted dirt, little maintenance, no water, 1" tire penetration 4.0 <br />Rolling <br />Res. ( %) <br />Total Res. <br />( %) <br />Permit/Job #: P2011018 <br />Abbreviation: None <br />Horsepower: 101 <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />0.020 <br />0.475 <br />Travel Time <br />(minutes) <br />Page 1 of 2 <br />Filename: P018 -02a <br />minutes <br />minutes <br />minutes <br />Source <br />25 <br />0.00 <br />4.00 <br />4.00 <br />0.0159 <br />(Cat HB) <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.