Laserfiche WebLink
Technical Revision TR -09 Approval <br />Stipulation No. Description N <br />(- <br />grout, include a description of any problems that occurred and their resolution, W <br />and will include compressive strength test results from the cured grout samples. 2 <br />4 The penetration of No. 3 -Dam by the abandoned No. 2 -Dam decant system could u <br />create a pathway for seepage and piping which are potential dam stability issues. F Q <br />Within 60 days of date of technical revision TR -09 approval, Henderson must (- <br />provide the Division with a report on this potential, which may comprise records < <br />on the construction of No. 3 -Dam as they relate to the decant system <br />penetrations, or if adequate historical records are unavailable Henderson must <br />provide the Division with a proposal to investigate the nature and condition of <br />the decant system penetrations. <br />If you have any questions, please contact me. <br />Allen C. Sorenson <br />Reclamation Specialist <br />e 4e,,„- <br />c:lwindowslpersanaflhenderson tr.9.doe <br />2 A . ril 27.2000 <br />