Laserfiche WebLink
CLIMAX MOLYBDENUM COMPANY <br />L I A Subsidiary of Ph 1pe Dodge Cerpareti,a <br />January 12, 2001 <br />Mr. Allen Sorenson <br />Environmental Protection Specialist <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />RE: 3 -Dam Seepwater Collection Project — Back -Up Pump Station CERTIFICATION, <br />Henderson Mill, Technical Revision TR -09, Permit No. M-77-342 <br />Dear Mr, Sorenson: <br />This letter is to provide the Division of Minerals and Geology (Division) with the last required <br />certification for our new 3-Dam seepwater lines. A certification to the Division stating that the <br />old 3 -Dam Seepwater pump station is operational is included with this letter. The Division <br />requested this certification in the 11/14/00- inspection report received from you. <br />The above mentioned inspection report asks for affirmation that both pumps are installed and in <br />working order at the 3 -Dam pump station. Per our phone call this week, I clarified that only one <br />pump was rebuildable and reinstalled at the pump station. With this pump in place, the 3 - Dam <br />pump station can function as an interim environmental protection facility (EPF). Adequate <br />storage capacity does exist in the 3-Dam seepwater collection ponds to facilitate procuring and <br />installing a 2"" pump if necessary. <br />Please call if you have any questions or are in need of any further information. I can be reached at <br />(303) 569 -3221 ext. 2214. <br />Very truly yours, <br />Erich Bower <br />Environmental Engineer <br />Climax Molybdenum Company <br />Enclosure <br />Cc: Mike Ley — Climax <br />Rich Wagner — Climax <br />Dave Long — Climax <br />rde <br />HENDERSON OPERATIONS <br />18302 County Road 3 <br />Parehs%. Colorado 80468 <br />(303) 569.3221 <br />Fox (970) 7250035 <br />