My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-09-27_REVISION - M1981185 (43)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1981185
>
2011-09-27_REVISION - M1981185 (43)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:58:20 PM
Creation date
9/28/2011 7:54:46 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981185
IBM Index Class Name
REVISION
Doc Date
9/27/2011
Doc Name
Supplemental response to fifth adequacy letter (CN-01)
From
Wildcat Mining Corporation
To
DRMS
Type & Sequence
CN1
Email Name
WHE
SSS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Direct Costs <br />Top Soil/Growth Media (Not <br />Available) <br />N/A <br />$0 <br />0.0 <br />0 <br />$132 <br />Regrade <br />$$$/hour <br />$110 <br />10.0 <br />0 <br />$1,100 <br />Regrade Disturbed Area <br />$$$/hour <br />$110 <br />8.0 <br />0 <br />$880 <br />Tilling/Acre <br />$$$/Acre <br />$90 <br />1.0 <br />0 <br />$90 <br />Seed Mix <br />$$$/Acre <br />$150 <br />2.0 <br />0 <br />$300 <br />Revegetage-Trees <br />$$$/Acre <br />$200 <br />1.0 <br />0 <br />$200 <br />BMP including Installation <br />Unit Rate <br />$1,500 <br />1.0 <br />0 <br />$1,500 <br />Amendments <br />$$$/Acre <br />Not Required <br />0.0 <br />0 <br />$0 <br />Weed Control <br />$$$/Acre <br />$150 <br />1.0 <br />0 <br />$150 <br />Rip Compacted Area <br />$$$/Hour <br />$150 <br />2.0 <br />0 <br />$300 <br />Mob/Demob <br />Lump Sum <br />$2,000 <br />1.0 <br />0 <br />$2,000 <br />Mine AredSub Total Direct, $6,520 <br />Indirect Costs <br />Liability Insurance <br />2.02 <br />% of Direct <br />0.0 <br />0 <br />$132 <br />Performance Bond <br />1.05 <br />% of Direct <br />0.0 <br />0 <br />$68 <br />Superintendent <br />$$$/hour <br />$80 <br />16.0 <br />0 <br />$1,280 <br />Profit <br />10 <br />% of Direct <br />0.0 <br />0 <br />$652 <br />Total Operating & Profit ' <br />$2,132 <br />Total May Day No. 2 Reclamation Costs $8,652 <br />Table L-2 (Continued) <br />May Day Idaho Mine Complex <br />Bonding Cost Summary (a) <br />Estimated Reclamation Costs <br />Wildcat Mining Company <br />Hesperus, Colorado <br />1 Task No 1 Task Description <br />Unit <br />Rate 1 # of Units ! Task Hours Costs <br />3 MAY DAY NO. 2 MINE PORTAL AND ROCK DISPOSAL SITE RECLAMATION <br />Page 3 <br />Total Direct $$$ $6,526 <br />
The URL can be used to link to this page
Your browser does not support the video tag.