Laserfiche WebLink
8. Describe the estimated topsoil depth and how topsoil will be salvaged, stockpiled and redistributed for the re- establishment of <br />vegetation. Specify approximate topsoil redistribution depth: <br />• <br />project area. <br />of app Ica aie <br />6 (FORM 2 - Public filing) <br />• <br />9. Describe how drill holes will be plugged (refer to Rule 5.4 of the Rules for required abandonment procedures): <br />• <br />10. Describe how portals, adits, shafts, ponds, excavations, or other disturbances will be reclaimed (refer to Rule 3 and Rule 5 for <br />specific reclamation performance standards). You may wish to contact the Division for closure specifications. <br />Portals will be filled with the adjacent rock talus as before. The shop building will be <br />removed acrd the concrete found w b e frac aril covered with 2 feet of the <br />. -. . •- -■..• • .. - .■ .. <br />■ • • - . . . - <br />containment will be removed, the liner will be disposed of at the Mineral County landfill <br />and the berm will be recontoured to pre- construction topography. The temporary office <br />and storage containeres will be removed trom me project area. Any disturbed and or <br />compactcd arcas will be rccontourcd to prc-construction topography and scarificd. <br />11. Describe how roads will be reclaimed or returned to their pre - prospecting (or better) condition: <br />