Laserfiche WebLink
5 (FORM 2 - Public filing) <br />G. Total project area to be disturbed 2 (acres) <br />K. Describe the equipment to be used for the prospecting operations: <br />The listed equipment is underground diesel powered and rubber tired: 1 - 3 <br />to 6 yard loader, 1 - 1 to 3 yard loader, 1 - 20 ton haul truck, 1 - single boom <br />jumbo drill, 1 - telehandler, up to 3 - UTV personel carriers (4 to 6 <br />as Lopco or equivalent. <br />L. Describe and locate any structures to be constructed (i.e. stockpiles, ponds, impoundments): <br />The diesel storage tanks will be set in a bermed, lined containment pond with a holding capacity in excess of <br />snow from accumulating in the containment pond. A semi- permanant 30' x 40' arched, fabric shop building <br />will be constructed on the existing concrete foundation adjacent to the Equty portal. See attached Equity <br />Exploration Project - Proposed Modification to Surface Infrastructure Map. <br />M. Describe anticipated relationship to surface water and groundwater (proximity to streams, penetration of ground <br />water aquifers): <br />There is no anticipated relationship to surface and ground water. There was no water trapped behind the <br />mine during the proposed exploration. Each underground hole will be abandoned in its entirety upon <br />completion. Any drill holes that encounter artesian water will be plugged and or capped. Storm water is <br />addressed with the Equity Storm Water Management Plan. <br />IV. OPERATION AND RECLAMATION MEASURES: <br />1. The Board suggests that a photographic record of the pre - prospecting and post - prospecting conditions be kept by the <br />prospector. These photos should be taken from the same location and by the same method to clearly show the pre - prospecting <br />condition of the land and the reclamation efforts. Upon completion of reclamation and request for bond or surety release, the <br />Board may consider the photos as evidence of adequate reclamation, and thus, be able to act more quickly on the request for <br />release. <br />2. Provide a description of the native vegetation of the area to be disturbed, including tree, shrub, and grass communities of the <br />area. Color photographs, sufficient to adequately represent the ecology of the site and adequately labeled (including date, <br />orientation and location), may be used in lieu of a written description. Based on the quality of the photographs, the Division <br />may require additional detail. <br />There is no vegetation in the project area. <br />• <br />previously UT a rock caius. <br />