o Flume was cleaned in March 2011 following CDRMS inspection. <br />• Gulch A Pond — fill animal burrows. <br />o Animal burrows were filled in March 2011 following CDRMS inspection. <br />• Prospect Pond — level the flume if necessary. <br />o Flume leveled in August 2011. <br />• Section 28 Pond — fix leaks in primary discharge, repair erosion on embankment. <br />o Primary discharge leaks fixed in May 2011. Embankment to be reseeded the <br />week of September 26, 2011. <br />• East Taylor Pond — level the flume. <br />o Flume leveled in June 2011. <br />The cleanout of East Taylor Pond began on August 2, 2011, and was completed on August <br />24, 2011. Gossard Loadout Pond cleanout began on August 26, 2011 and should be <br />complete during the week of September 19, 2011. Colowyo will also do a partial cleanout <br />of Rail Loop pond, beginning after the Gossard Loadout Pond is complete. <br />Please contact me at tracv.brownAriotinto.com or 970 - 824 -1573 with questions or <br />comments. <br />Sincerel , <br />Chip Brown <br />Environmental Engineer <br />CC: CDRMS /Janet H. Binns <br />C.F. 21.1.2 <br />