Laserfiche WebLink
Description <br />Quantity <br />Centrifugal pump - 40M, 4 in. <br />1 <br />Suction hose - 4 in. diam., 25 ft. <br />1 <br />Discharge hose - 4 in. D., 25 ft. <br />1 <br />Pump operator <br />1 <br />Task description: <br />Site: Seneca II Mine <br />PROJECT IDENTIFICATION <br />Task #: <br />Date: <br />User: <br />022 <br />9/20/2011 <br />JDM <br />HOURLY EQUIPMENT COST <br />Make and Model: <br />Attachment 1: <br />Attachment 2: <br />Labor Unit 1: <br />Horsepower: <br />Shift Basis: <br />Weight: <br />Cost Breakdown: <br />PUMPING TIME <br />Unit cost: <br />45 <br />1 per day <br />0.70 <br />(US Tons) <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Operator Cost/Hour: <br />Total Unit Cost/Hour: <br />Total Fleet Cost/Hour: <br />PUMPING QUANTITIES <br />Initial Pond Volume: <br />Final Pond Volume: <br />Total Pond Inflow Surface <br />Area: <br />Total Pond Inflow Volume <br />per Hour: <br />PUMPING WORK <br />Dredge Pond 008 Once During Liability Period <br />$0.000671 /Gallon <br />Permit Action: RN6 <br />State: Colorado <br />County: Routt <br />Agency or organization name: DRMS <br />$3.14 <br />$8.51 <br />$19.42 <br />$31.07 <br />$31.07 <br />3.90 <br />1,270,817.26 <br />103,500 <br />18,195.30 <br />Source of estimated volume: Division <br />Maximum Pump Capacity: <br />Estimated Suction Head: <br />Estimated Discharge Head: <br />Total Head: <br />CPB Pump Capacity: <br />Site Altitude: <br />Adjusted Pumping Capacity: <br />Initial Unadjusted Pumping Time: <br />Inflow during Initial Pumping: <br />Net Unadjusted Pumping Time: <br />Altitude Adjustment Factor: <br />Pump Efficiency Factor: <br />Total Adjusted Pumping Time: <br />JOB TIME AND COST <br />Utilization % <br />NA <br />100 <br />NA <br />gallons <br />Sq. ft. <br />gallons <br />40,000 <br />7 <br />8 <br />15 <br />39,900 <br />7,500 <br />39,900 <br />31.85 <br />579,521 <br />46.37 <br />0.9400 <br />0.9167 <br />39.96 <br />Total job time: <br />Total job cost: <br />Abbreviation: None <br />Conversion factor: 325850.5800 <br />Unit inflow rate in <br />gph/sq. ft.: <br />gph/pump <br />feet <br />feet <br />feet <br />gph/pump <br />feet <br />gph <br />hours <br />gallons <br />Hours <br />(3% rule) <br />(55 min. /hr.) <br />hours <br />Permit/Job #: C1980005 <br />Filename: C005 -022 <br />39.96 <br />$1,242.00 <br />0.1758 <br />Hours <br />CIR(ES Cost Estimating Software <br />