Laserfiche WebLink
Seg # <br />Haul Distance <br />Grade ( %) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />(Ft) <br />( %) <br />( %) <br />(fpm) <br />Ti <br />1 <br />5000.00 <br />5.00 <br />3.00 <br />8.00 <br />1381 <br />3.646 <br />Seg # <br />Haul Distance <br />Grade ( %) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />(Ft) <br />( %) <br />( %) <br />(fpm) <br />Time <br />1 <br />5000.00 <br />-5.00 <br />3.00 <br />-2.00 <br />2938 <br />1.754 <br />Truck/Loader Worksheet Cont'd <br />Haul Route: <br />Task # 021 <br />Return Route: <br />Haul Time: <br />Return Time: <br />3.646 <br />1.754 <br />Total Truck Cycle Time: 8.135 <br />Loading Tool unit <br />Production 272.09 LCY/Hour Adjusted for job efficiency: 225.84 LCY/Hour <br />Truck Unit Production <br />64.72 LCY/Hour Adjusted for job efficiency: 53.72 LCY/Hour <br />Optimal No. of Trucks: 4 Truck(s) Selected Number of Trucks: 2 Truck(s) <br />Adjusted hourly truck team production: 107.44 LCY/Hour <br />Adjusted single truck/loader team production: 107.44 LCY/Hour <br />Adjusted multiple truck/loader team production: 107.44 LCY/Hour <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) Total job time: 226.34 Hours <br />Unit cost: $3.535 /LCY Total job cost: $85,958.42 <br />minutes <br />minutes <br />minutes <br />Page 3 of 3 <br />CIRCES Cost Estimating Software <br />