Laserfiche WebLink
Task description: Remove TAHR Surface Material to Pit <br />Site: Hayden Gulch Loadout Permit Action: Permit Revision 1 <br />PROJECT IDENTIFICATION <br />Task #: <br />Date: <br />User: <br />HOURLY EQUIPMENT <br />Cost Breakdown: <br />502 <br />9/16/2011 <br />JRS <br />Agency or organization name' DRMS <br />Support Equipment -Load Area: <br />-Dump Area: <br />Road Maintenance —Motor Grader: <br />-Water Truck: <br />MATERIAL QUANTITIES <br />Initial volume: 112,900 <br />HOURLY PRODUCTION <br />Material weight: <br />Material description: <br />Rated Payload: <br />Payload Capacity: <br />County: Routt <br />- Scraper: <br />- Dozer: <br />Scraper Work Team <br />Total work team cost/hour: $1,420.99 <br />Loose volume: 112,900 <br />Source of estimated volume: <br />2,550 lbs /LCY <br />Gravel - Dry <br />75,000 pounds <br />29.41 LCY <br />SCRAPER TEAM WORK <br />State: Colorado <br />Equipment Description <br />Cat 637G w /push -pull <br />NA <br />NA <br />NA <br />CAT 14H <br />Water Tanker, 10,000 Gal. <br />CCY <br />LCY <br />Source of estimated swell factor: Cat Handbook <br />COSTShift basis: 1 per day <br />Support Equipment <br />Swell factor: 1.000 <br />Seneca II -W Permit Page 25 -1 -22 <br />Scraper Bowl (volume) Basis: <br />Struck Volume: <br />Heaped Volume: <br />Average Volume: <br />Adjusted Capacity: <br />24.00 <br />34.00 <br />29.00 <br />29.00 <br />Permit/Job #: C1992081 <br />Abbreviation: None <br />Page 1 of 2 <br />Filename: C081 -502 <br />Maintenance Equipment <br />LCY <br />LCY <br />LCY <br />LCY <br />CIRCES Cost Estimating Software <br />Scraper <br />Dozer <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization- machine: <br />100 <br />NA <br />NA <br />NA <br />25 <br />25 <br />Ownership cost/hour: <br />$91.74 <br />NA <br />NA <br />NA <br />$34.52 <br />$56.12 <br />Operating cost/hour: <br />$190.61 <br />NA <br />NA <br />NA <br />$13.28 <br />$24.70 <br />Ripper op. cost/hour: <br />NA <br />NA <br />NA <br />NA <br />$0.00 <br />$0.00 <br />Operator cost /hour: <br />$24.95 <br />NA <br />NA <br />NA <br />$24.47 <br />$38.70 <br />Unit Subtotals: <br />$307.30 <br />NA <br />NA <br />NA <br />$72.27 <br />$119.52 <br />Number of Units: <br />4 <br />0 <br />0 <br />0 <br />1 <br />1 <br />Group Subtotals: <br />Work: <br />$1,229.20 <br />Support: <br />$0.00 <br />Maint: <br />$191.79 <br />Task description: Remove TAHR Surface Material to Pit <br />Site: Hayden Gulch Loadout Permit Action: Permit Revision 1 <br />PROJECT IDENTIFICATION <br />Task #: <br />Date: <br />User: <br />HOURLY EQUIPMENT <br />Cost Breakdown: <br />502 <br />9/16/2011 <br />JRS <br />Agency or organization name' DRMS <br />Support Equipment -Load Area: <br />-Dump Area: <br />Road Maintenance —Motor Grader: <br />-Water Truck: <br />MATERIAL QUANTITIES <br />Initial volume: 112,900 <br />HOURLY PRODUCTION <br />Material weight: <br />Material description: <br />Rated Payload: <br />Payload Capacity: <br />County: Routt <br />- Scraper: <br />- Dozer: <br />Scraper Work Team <br />Total work team cost/hour: $1,420.99 <br />Loose volume: 112,900 <br />Source of estimated volume: <br />2,550 lbs /LCY <br />Gravel - Dry <br />75,000 pounds <br />29.41 LCY <br />SCRAPER TEAM WORK <br />State: Colorado <br />Equipment Description <br />Cat 637G w /push -pull <br />NA <br />NA <br />NA <br />CAT 14H <br />Water Tanker, 10,000 Gal. <br />CCY <br />LCY <br />Source of estimated swell factor: Cat Handbook <br />COSTShift basis: 1 per day <br />Support Equipment <br />Swell factor: 1.000 <br />Seneca II -W Permit Page 25 -1 -22 <br />Scraper Bowl (volume) Basis: <br />Struck Volume: <br />Heaped Volume: <br />Average Volume: <br />Adjusted Capacity: <br />24.00 <br />34.00 <br />29.00 <br />29.00 <br />Permit/Job #: C1992081 <br />Abbreviation: None <br />Page 1 of 2 <br />Filename: C081 -502 <br />Maintenance Equipment <br />LCY <br />LCY <br />LCY <br />LCY <br />CIRCES Cost Estimating Software <br />