My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-09-21_REVISION - C1992081
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1992081
>
2011-09-21_REVISION - C1992081
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:43:18 PM
Creation date
9/23/2011 7:42:24 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992081
IBM Index Class Name
REVISION
Doc Date
9/21/2011
Doc Name
Adequacy Review
From
DRMS
To
Hayden Gulch Terminal, LLC
Type & Sequence
PR1
Email Name
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BULLDOZER RIPPING WORK <br />Task description: Rip TAHR <br />Site: Hayden Gulch Loadout Permit Action: Permit Revision 1 Permit/Job #: C1992081 <br />PROJECT IDENTIFICATION <br />Task #: 501 <br />Date: 9/16/2011 <br />User: JRS <br />Cost Breakdown: <br />Area: <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Ripper Operating Cost/Hour: <br />Operator Cost/Hour: <br />Total Unit Cost/Hour: <br />State: Colorado <br />County: Routt <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D1OR - 10SU (2005) <br />Ripper Attachment: 1 -Shank Ripper <br />Seismic Velocity: <br />Average Ripping Depth: <br />Average Ripping Width: <br />Average Ripping Length: <br />Average Dozer Speed: <br />Average Maneuver Time: <br />Production per unit area: <br />$80.89 <br />$147.96 <br />$11.24 <br />$38.49 <br />$278.58 <br />Utilization % <br />NA <br />100 <br />100 <br />NA <br />NA feet/second <br />4.49 mph <br />6.74 degrees <br />300.00 feet <br />88.00 feet <br />0.25 feet <br />0.761 acres /hour <br />Job Condition Correction Factors <br />Unadjusted Hourly Unit Production: 0.761 Acres /hr <br />Site Altitude: 7,500 feet <br />Altitude Adj: 1.00 (CAT HB) <br />Job Efficiency: 0.83 (1 shift/day) <br />Net Correction: 0.83 multiplier <br />Adjusted Hourly Unit Production: 0.63 Acres/hr <br />Abbreviation: None <br />Filename: C081 -501 <br />Horsepower: 570 <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Total Fleet Cost/Hour: $557.16 <br />MATERIAL QUANTITIES Selected estimating method: Area <br />Alternate Methods: <br />Seismic: NA Bank Volume: NA BCY NA <br />Area: 70 acres Rip Depth (ft): 3.00 Volume: 338,800 BCY or CCY <br />Source of estimated quantity: Seneca II -W Permit Page 25 -1 -19 <br />HOURLY PRODUCTION <br />Seismic: <br />Adjusted Hourly Fleet Production: 1.26 Acres /hr <br />JOB TIME AND COST <br />Fleet size: 2 Grader(s) Total job time: 55.40 Hours <br />Unit cost: $440.961 Per acre Total job cost: $30,867.00 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.