My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-09-19_REVISION - M1977484
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977484
>
2011-09-19_REVISION - M1977484
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 2:10:31 PM
Creation date
9/22/2011 7:40:31 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977484
IBM Index Class Name
REVISION
Doc Date
9/19/2011
Doc Name
Cost Summary
From
DRMS
To
File
Type & Sequence
SO1
Email Name
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task description: <br />Site: Gravel Pit No 7 <br />PROJECT IDENTIFICATION <br />Task #: <br />Date: <br />User: <br />Cost Breakdown: <br />002 <br />9/19/2011 <br />JLE <br />Material weight: <br />Material description: <br />Rated Payload: <br />Payload Capacity: <br />Agency or organization name: <br />HOURLY EQUIPMENT <br />Spreading Topsoil over 12.85 Acres <br />County: Baca <br />DRMS <br />- Scraper: <br />- Dozer: <br />Support Equipment -Load Area: <br />-Dump Area: <br />Road Maintenance —Motor Grader: <br />-Water Truck: <br />Total work team cost /hour: $742.10 <br />MATERIAL QUANTITIES <br />Initial volume: <br />Loose volume: <br />Scraper Work Team <br />10,350 <br />10,350 <br />Source of estimated volume: <br />Source of estimated swell factor: <br />HOURLY PRODUCTION <br />1,600 lbs /LCY <br />Top Soil <br />48,000 pounds <br />30.00 LCY <br />SCRAPER TEAM WORK <br />Permit Action: SO01 <br />State: Colorado <br />Equipment Description <br />Cat 627G w /push -pull <br />Cat D9R - 9SU (2005) <br />NA <br />NA <br />CAT 14H <br />Water Tanker, 3,500 Gal. <br />CCY <br />LCY <br />Cat Handbook <br />COSTShift basis: 1 per day <br />Support Eauinment <br />Swell factor: 1.000 <br />Division of Reclamation, Mining & Safety <br />Scraper Bowl (volume) Basis: <br />Struck Volume: <br />Heaped Volume: <br />Average Volume: <br />Adjusted Capacity: <br />15.70 <br />22.00 <br />18.85 <br />18.85 <br />Page 1 of 2 <br />Permit/Job #: M1977484 <br />Abbreviation: None <br />Filename: M484 -002 <br />Maintenance Equipment <br />LCY <br />LCY <br />LCY <br />LCY <br />CIRCES Cost Estimating Software <br />Scraper <br />Dozer <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization- machine: <br />100 <br />100 <br />NA <br />NA <br />25 <br />25 <br />Ownership cost/hour: <br />$57.56 <br />$49.19 <br />NA <br />NA <br />$34.52 <br />$10.94 <br />Operating cost/hour: <br />$144.11 <br />$110.89 <br />NA <br />NA <br />$13.28 <br />$7.10 <br />Ripper op. cost/hour: <br />NA <br />$0.00 <br />NA <br />NA <br />$0.00 <br />$0.00 <br />Operator cost/hour: <br />$24.95 <br />$38.49 <br />NA <br />NA <br />$24.47 <br />$0.00 <br />Unit Subtotals: <br />$226.61 <br />$198.57 <br />NA <br />NA <br />$72.27 <br />$18.04 <br />Number of Units: <br />2 <br />1 <br />0 <br />0 <br />1 <br />1 <br />Group Subtotals: <br />Work: <br />$651.79 <br />Support: <br />$0.00 <br />Maint: <br />$90.31 <br />Task description: <br />Site: Gravel Pit No 7 <br />PROJECT IDENTIFICATION <br />Task #: <br />Date: <br />User: <br />Cost Breakdown: <br />002 <br />9/19/2011 <br />JLE <br />Material weight: <br />Material description: <br />Rated Payload: <br />Payload Capacity: <br />Agency or organization name: <br />HOURLY EQUIPMENT <br />Spreading Topsoil over 12.85 Acres <br />County: Baca <br />DRMS <br />- Scraper: <br />- Dozer: <br />Support Equipment -Load Area: <br />-Dump Area: <br />Road Maintenance —Motor Grader: <br />-Water Truck: <br />Total work team cost /hour: $742.10 <br />MATERIAL QUANTITIES <br />Initial volume: <br />Loose volume: <br />Scraper Work Team <br />10,350 <br />10,350 <br />Source of estimated volume: <br />Source of estimated swell factor: <br />HOURLY PRODUCTION <br />1,600 lbs /LCY <br />Top Soil <br />48,000 pounds <br />30.00 LCY <br />SCRAPER TEAM WORK <br />Permit Action: SO01 <br />State: Colorado <br />Equipment Description <br />Cat 627G w /push -pull <br />Cat D9R - 9SU (2005) <br />NA <br />NA <br />CAT 14H <br />Water Tanker, 3,500 Gal. <br />CCY <br />LCY <br />Cat Handbook <br />COSTShift basis: 1 per day <br />Support Eauinment <br />Swell factor: 1.000 <br />Division of Reclamation, Mining & Safety <br />Scraper Bowl (volume) Basis: <br />Struck Volume: <br />Heaped Volume: <br />Average Volume: <br />Adjusted Capacity: <br />15.70 <br />22.00 <br />18.85 <br />18.85 <br />Page 1 of 2 <br />Permit/Job #: M1977484 <br />Abbreviation: None <br />Filename: M484 -002 <br />Maintenance Equipment <br />LCY <br />LCY <br />LCY <br />LCY <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.