My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-09-19_REVISION - M1977484
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977484
>
2011-09-19_REVISION - M1977484
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 2:10:31 PM
Creation date
9/22/2011 7:40:31 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977484
IBM Index Class Name
REVISION
Doc Date
9/19/2011
Doc Name
Cost Summary
From
DRMS
To
File
Type & Sequence
SO1
Email Name
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.000 <br />(AVG.) <br />0.830 <br />(1 SHIFT /DAY) <br />1.000 <br />(DOZ -OC) <br />1.329 <br />(CAT HB) <br />1.000 <br />(CAT HB) <br />1.095 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Bulldozer Worksheet Cont'd <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />Adjusted unit production: 1,469.43 LCY/hr <br />Adjusted fleet production: 1469.43 LCY/hr <br />JOB TIME AND COST <br />Fleet size: <br />Unit cost: <br />Total job time: <br />Total job cost: <br />Net correction: 1.0871 <br />1 Dozer(s) <br />$0.135/LCY <br />6.29 Hours <br />$1,249.42 <br />Task # 001 <br />Page 2 of 2 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.