Laserfiche WebLink
September 12,2011 C-1982-057/Seneca 11-W Mine SLB <br /> Inspection Topic Summary <br /> NOTE: Y=Inspected N=Not Inspected R=Comments Noted V=Violation Issued NA=Not Applicable <br /> NA -Air Resource Protection R -Roads <br /> R -Availability of Records Y -Reclamation Success <br /> R -Backfill &Grading R -Revegetation <br /> NA -Excess Spoil and Dev.Waste NA - Subsidence <br /> NA -Explosives R - Slides and Other Damage <br /> R -Fish &Wildlife Y - Support Facilities On-site <br /> R -Hydrologic Balance R - Signs and Markers <br /> Y -Gen. Compliance With Mine Plan NA - Support Facilities Not On-site <br /> NA -Other NA - Special Categories Of Mining <br /> NA -Processing Waste R -Topsoil <br /> COMMENTS <br /> This was a complete inspection of the Seneca IIW Mine conducted by Susan Burgmaier or DRMS. Roy Karo and <br /> Dennis Bugay were present during a portion of the site inspection. Weather conditions were clear and dry,with <br /> afternoon rain showers. <br /> AVAILABILITY OF RECORDS—Rule 5.02.4(1): <br /> Records were inspected at the Sage Creek Mine office and the Seneca Coal Company office. All required <br /> records were available and up to date; inventory of records is attached. <br /> BACKFILL and GRADING—Rule 4.14 Contemporaneous Reclamation 4.14.1;Approximate Original Contour <br /> 4.14.2;Highwall Elimination 4.14.1(2)69; Steep Slopes 4.14.2, 4.27;Handling ofAcid and Toxic Materials <br /> 4.14.3; Stabilization ofRills and Gullies 4.14.6: <br /> Several postmining drainage channels were walked and closely inspected. 005 Gulch was in excellent <br /> condition. NE4 and NE1 were in good condition;there were a few gullies around the channel,but no significant <br /> problems were observed. 006-NE2 needs to be reworked where the rip rap has slid down the Mirafi channel liner. <br /> 006 Gulch was in good condition between the Ridgeline Road and Pond 006,but needed to be maintained <br /> upgradient of the Ridgeline Road and right at the entrance to Stock pond T5. PM-IA was in poor condition as a <br /> result of heavy rainfall in July; most of the rip rap in the drainage was dislodged and dumped into the surge ponds <br /> and stock pond. Channels 2C, 21), and 2E were all in need of maintenance and in some areas reconstruction, also <br /> as a result of July storms. <br /> There is an unnamed channel on the north/northeast side of the oil well pad that has been lined with TRM. There <br /> is a gully below the point where TRM lining ends (where the channel meets the fence line above the well pad on <br /> the steep pad inslope)that needs to be repaired. <br /> FISH and WILDLIFE Rule 4.18: <br /> Number of Partial Inspection this Fiscal Year: 5 <br /> Number of Complete Inspections this Fiscal Year: 1 <br /> Page 2 of 10 <br />