My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-09-15_REVISION - M1981185
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1981185
>
2011-09-15_REVISION - M1981185
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:58:19 PM
Creation date
9/21/2011 10:23:02 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981185
IBM Index Class Name
REVISION
Doc Date
9/15/2011
Doc Name
Exhibit A Legal Description (CN-01)
From
DRMS-WHE
To
File
Type & Sequence
CN1
Email Name
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
R 2 INCORPORATED <br />ENVIRONMENTAL AND ENGINEERING SERVICES <br />6.4.1(1) Affected Land <br />STRATEGICALLY POSITIONED - TECHNICALLY PREPARED <br />MAY DAY IDAHO MINE COMPLEX <br />WILDCAT MINING CORPORATION <br />ORIGINAL 112(D) PERMIT <br />EXHIBIT A <br />Legal Description <br />Rule 6.4.1 <br />GEORGE M.L. ROBINSON,P.G. <br />J. ERICH RAUBER,P.E. <br />The May Day Idaho Mine Complex permit boundary is comprised of 274.7 acres of which 44.23 <br />acres are affected directly or indirectly by proposed mining activities. The township and range <br />of the permit boundary is in Section 21 and Section 28, T36N, RI 1 W, N.M.P.M. <br />The main entrance to the May Day Idaho Mine Complex Universal Transverse Mercator (UTM) <br />Grid as determined by the United State Geological Survey (USGS) is 575797 413661. <br />The May Day Idaho Mine Complex includes the following affected lands: <br />May Day No. 1, May Day No. 1 East, May Day No.2, May Day No. 3 (Lamb), Idaho <br />Millsite, Payday Millsite, the Chief Tunnel including the access road and drainage channel, <br />La Plata Bridge, pre - existing roads, the New Access Road, and designated buffer zones <br />within the identified permit boundary (Figure C -4). <br />Wildcat Mining Corporation (Wildcat) has acquired or leased the following legal descriptions for <br />these affected areas: <br />The May Day parcels owned by Fairview Land Company and leased to Wildcat (Attachment <br />N -2) include the following parcel legal descriptions: <br />May Day No. 1: a tract of land located in Section 28, T36N, R11 W, N.M.P.M. and being <br />more particularly described as follows: beginning at a point from which the W1/4 corner <br />of said Section 28 bears S 70 °58'59 "W a distance of 3268.40 feet, Thence, N 33 °15'W a <br />distance of 300.0 feet, Thence N 56 °45 E a distance of 500.0 feet, Thence S 33 °15'E a <br />DEN 97,573,100v1 8-4-11 <br />Wildcat Mining Corporation <br />112(d) Permit — May Day and Idaho Mine and Mill Application <br />5555 DTC Parkway Suite A -4000, Greenwood Village, Colorado 80111 <br />Phone: (303) 832 -7664 Fax: (303) 832 -7469 <br />1 Revision: October 22, 20101 Revised: July 27, 2011 <br />
The URL can be used to link to this page
Your browser does not support the video tag.