Laserfiche WebLink
PROJECT IDENTIFICATION <br />Task # : <br />Date : <br />User: <br />004 <br />09/16/2011 <br />RCO <br />Agency or organization name :DRMS <br />Permit or other job action : TR -17 <br />Task description : Grade borrow areas <br />HOURLY EQUIPMENT COST <br />Cost Breakdown : <br />MATERIAL QUANTITIES <br />Initial <br />volume : 2,420 <br />HOURLY PRODUCTION <br />Material consistency description : <br />Partly consolidated stockpile <br />CCY <br />State :Colorado <br />County :Mineral <br />Site :Bulldog Mine <br />Ownership cost/hour : <br />Operating cost/hour : <br />Ripper op. cost/hour : <br />Operator cost/hour : <br />Total unit cost/hour : <br />Source of estimated volume :0.5 ac x 6 inch depth <br />Source of estimated swell factor :NA <br />Average push distance : 75 feet <br />Unadjusted hourly production : 1,514.3 LCY /hr <br />Average push gradient : 5.00 % (neg) <br />Average site altitude : 8,930 feet <br />Material weight : 3,300 Ibs /LCY <br />Weight description : <br />Decomposed rock - 75% Rock, 25% Earth <br />JOB TIME AND COST <br />Fleet size : <br />Unit cost : <br />CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />A <br />Basic machine : Cat D9R - 9SU (2005) <br />Blade type : Semi - Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 : 3 -shank ripper <br />1 Dozer(s) <br />$0.376 /LCY <br />Swell <br />factor : <br />$67.77 <br />$95.29 <br />$0.00 <br />$38.54 <br />$201.60 <br />Permit/job# :M-1977-215 <br />Abbreviation :none <br />Filename : M215 -004 <br />Utilization % <br />NA <br />100 <br />0 <br />NA <br />Loose <br />1.125 volume : 2,722 LCY <br />Job Condition Correction Factors <br />Operator skill : <br />Material consistency : <br />Dozing method : <br />Visibility : <br />Job efficiency : <br />Spoil pile : <br />Push gradient : <br />Altitude : <br />Material weight : <br />Blade type : <br />Net correction : <br />Horsepower : 405 <br />Shift basis : 1 per day <br />Data source : (CRG) <br />Total fleet cost/hour : <br />0.75 <br />1.10 <br />1.00 <br />1.00 <br />0.83 <br />0.70 <br />1.11 <br />0.95 <br />0.70 <br />1.00 <br />0.35 <br />$201.60 <br />Source <br />(avg.) <br />(Cat HB) <br />(gen.) <br />(avg.) <br />(1 shift/day) <br />(fnd -mf) <br />(Cat HB) <br />(Cat HB) <br />(Cat HB) <br />(S /SU /U) <br />Adjusted unit production : 535.86 LCY /hr <br />Adjusted fleet production : 535.86 LCY /hr <br />Total job time : <br />Total job cost : <br />5.08 Hours <br />$1,024 <br />