My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-09-16_REVISION - M1977215
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977215
>
2011-09-16_REVISION - M1977215
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2020 2:21:04 PM
Creation date
9/21/2011 10:22:54 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977215
IBM Index Class Name
REVISION
Doc Date
9/16/2011
Doc Name
TR-17 approval
From
DRMS
To
Rio Grande Silver, Inc.
Type & Sequence
TR17
Email Name
RCO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT IDENTIFICATION <br />Task # : <br />Date : <br />User : <br />003 <br />09/16/2011 <br />RCO <br />Agency or organization name :DRMS <br />Permit or other job action : TR -17 <br />Task description :Remove pond #2 embankment <br />HOURLY EQUIPMENT COST <br />Cost Breakdown : <br />MATERIAL QUANTITIES <br />Initial <br />volume : 3,700 <br />HOURLY PRODUCTION <br />Material consistency description : <br />Consolidated stockpile <br />Material weight : <br />Weight description : <br />Sand - Wet <br />JOB TIME AND COST <br />Fleet size : <br />Unit cost : <br />LCY <br />CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />State :Colorado <br />County :Mineral <br />Site :Bulldog Mine <br />Basic machine : Cat D9R - 9SU (2005) <br />Blade type : Semi - Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 : 3 -shank ripper <br />Ownership cost/hour : <br />Operating cost/hour : <br />Ripper op. cost/hour : <br />Operator cost/hour : <br />Total unit cost/hour : <br />Swell <br />factor : <br />Source of estimated volume :embankment design <br />Source of estimated swell factor :NA <br />Average push distance : 100 feet <br />Unadjusted hourly production : 1,243.2 LCY /hr <br />Average push gradient : 5.00 % (neg) <br />Average site altitude : 8,930 feet <br />3,100 lbs/LCY <br />1 Dozer(s) <br />$0.474 /LCY <br />$67.77 <br />$95.29 <br />$0.00 <br />$38.54 <br />$201.60 <br />NA <br />Permit/job# :M-1977-215 <br />Abbreviation :none <br />Filename : M215 -003 <br />Utilization % <br />NA <br />100 <br />0 <br />NA <br />Loose <br />volume : <br />Job Condition Correction Factors <br />Operator skill : <br />Material consistency : <br />Dozing method : <br />Visibility : <br />Job efficiency : <br />Spoil pile : <br />Push gradient : <br />Altitude : <br />Material weight : <br />Blade type : <br />Net correction : <br />Horsepower : 405 <br />Shift basis : 1 per day <br />Data source : (CRG) <br />Total fleet cost/hour : <br />3,700 <br />0.75 <br />1.00 <br />1.00 <br />1.00 <br />0.83 <br />0.70 <br />1.11 <br />0.95 <br />0.74 <br />1.00 <br />0.34 <br />$1,752 <br />$201.60 <br />LCY <br />Source <br />(avg.) <br />(Cat HB) <br />(gen.) <br />(avg.) <br />(1 shift/da y) <br />(fnd -mt) <br />(Cat HB) <br />(Cat HB) <br />(Cat HB) <br />(S /SU /U) <br />Adjusted unit production : 425.74 LCY /hr <br />Adjusted fleet production : 425.74 LCY /hr <br />Total job time : 8.69 Hours <br />Total job cost : <br />
The URL can be used to link to this page
Your browser does not support the video tag.