Laserfiche WebLink
iSMIEFElt <br />PROJECT IDENTIFICATION <br />UNIT COSTS <br />STRUCTURE or ITEM DESCRIPTION <br />-Cut HDPE liner for removal <br />-Load and haul rolled liner <br />-Haul to landfill <br />- Dispose piping, valves, etc. <br />-bury debris onsite <br />JOB COST <br />001 <br />Task # : <br />Date : 16- Sep -2011 <br />User : RCO <br />Permitting action : TR -17 <br />CIRCES Cost EstimatinqSoftware <br />DEMOLITION WORK <br />Agency or organization name : DRMS <br />Task description : Remove and dispose of holding pond liners, piping, etc. <br />Last unit cost update : March 2009 <br />10 -ft wide strips <br />10 -ft wide rolls <br />9600 cf <br />20 cy <br />20 cy <br />Manual cut and roll <br />Manual loading <br />Load/2 mi. haul, no slug. -Mach. L. <br />Excavate /backfill disposal pit <br />Push rubble into pit - to 100 ft. <br />173.00 <br />6.00 <br />360.00 <br />20.00 <br />20.00 <br />1000 SF <br />Ea Load <br />CY <br />CY <br />CY <br />$20.0000 <br />$300.0000 <br />$13.3500 <br />$2.1280 <br />$0.6080 <br />DIMENSIONS <br />Subtotal (unadjusted): <br />DEMOLITION MENU SELECTION <br />$10,121 <br />State : Colorado <br />County :Mineral <br />Site :Bulldog Mine <br />QUANTITY <br />UNIT <br />Total Cost (adjusted for location): <br />Permit/job# :M-1977-215 <br />Abbreviation : none <br />Filename :M215-001 <br />Location adjustment : <br />UNIT COST <br />96.83% <br />TOTAL COST <br />$3,460.00 <br />$1,800.00 <br />$4, 806.00 <br />$42.56 <br />$12.16 <br />$9,800 <br />