Laserfiche WebLink
PROJECT IDENTIFICATION <br />Date : 16- Sep -2011 <br />User: <br />Permit or job action : TR -17 Temporary Holding Ponds <br />SW- <br />008 <br />RCO <br />Agency or organization name :DRMS <br />- Removeand dispose of holding pond liners, piping, etc. <br />- Backfill pond #1 <br />- Remove pond #2 embankment <br />-Grade borrow areas <br />-Carry topsoil to be spread <br />- Spread topsoil on disturbed areas <br />-Rip compaction on pads and roads <br />- Revegetate disturbed areas (pads, ponds, roads, etc.) <br />No mobilization cost - already included in bond. <br />001 <br />002 <br />003 <br />004 <br />005 <br />006 <br />FORM FLEET TASK <br />USED SIZE HOURS <br />demolish 1 20.0 <br />dozer 1 0.5 <br />dozer 1 8.6 <br />dozer 1 5.0 <br />loader 1 <br />dozer 1 5.4 <br />ripper 1 0.7 <br />revege 1 8.0 <br />$9,800 <br />$22,051 <br />TASK LIST (DIRECT COSTS) <br />NO. TASK DESCRIPTION <br />* includes inflation factor adjustment of : NA <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT - <br />* assume net hours = 50% of task hours <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT - <br />Financial warranty processing (legal /related costs) : <br />Engineering work and /or contract/bid preparation : <br />Reclamation management and /or administration : <br />CONTINGENCY - <br />* contingencies accounted for at task level <br />CIRCES Cost Estimating Software <br />COST SUMMARY FORM <br />Permit or job no. : <br />Abbreviation : <br />Filename : <br />Liability insurance : <br />Performance bond : <br />Job superintendent : <br />Profit : <br />Site :Bulldog Mine <br />State : Colorado <br />M215 -000 County :Mineral <br />M - 1977 - 215 <br />none <br />2.02 % of direct total = <br />1.05 % of direct total = <br />30.39 hrs *...$ /hr: $52.10 total = <br />10.00 % of direct total = <br />TOTAL 0 & P = <br />CONTRACT AMOUNT (direct + 0 & P) = <br />total $ NA total = <br />500.00 <br />NA <br />5.00 <br />NA* <br />NA <br />% of cntr. <br />NA <br />SUBTOTALS <br />TOTAL DIRECT COST = $22,051 <br />NA <br />NA <br />total = <br />total = <br />total = <br />TOTAL INDIRECT COST = <br />TOTAL BOND AMOUNT (direct + indirect) = <br />DIRECT <br />COST <br />$120 <br />$1,752 <br />$1,024 <br />$902 <br />$1,103 <br />$131 <br />$7,219 <br />$445 <br />$232 <br />$1,583 <br />$2,205 <br />$4,465 <br />$26, 516 <br />$500 <br />NA <br />$1,326 <br />NA <br />$6,291 <br />$28,342 <br />