Laserfiche WebLink
Task <br />Number <br />Description <br />Task <br />Hours <br />Equip <br />Used <br />CPM <br />Charting <br />Net Hours <br />002 <br />Backfill and regrade portal bench and access road <br />13.85 <br />1 <br />0^ <br />13.85 <br />003 <br />Regrade water treatment pond <br />9.56 <br />1 <br />0^ <br />9.56 <br />004 <br />Rip and Regrade portal bench and access road <br />6.90 <br />1 <br />0^ <br />6.90 <br />005 <br />Regrade ditches <br />1.59 <br />1 <br />100^ <br />0.00 <br />006 <br />Regrade sediment pond <br />17.31 <br />1 <br />0^ <br />17.31 <br />007 <br />Redistribute topsoil over facilities area <br />53.67 <br />1 <br />0^ <br />53.67 <br />008 <br />Demolish culverts and pond pipes <br />8.00 <br />1 <br />100^ <br />0.00 <br />009 <br />Seal main portal and beltline entry <br />40.00 <br />1 <br />100^ <br />0.00 <br />011 <br />Drill seed facilities area <br />7.28 <br />1 - <br />0^ <br />7.28 <br />012 <br />Broadcase seed steep slope areas <br />1.80 <br />l <br />0^ <br />1.80 <br />013 <br />Plant tublings in riparian areas <br />64.00 <br />1 <br />100^ <br />0.00 <br />014 <br />Haul equipment for initial reclamation <br />16.67 <br />1 <br />0^ <br />16.67 <br />018 <br />Seal alluvial wells AA1 and AA3 <br />8.00 <br />1 <br />0^ <br />8.00 <br />07b <br />Rip /scarify replaced topsoil <br />17.37 ' <br />I <br />75" <br />4.34 <br />14b <br />Haul equipment for maintenance <br />16.67 <br />1 <br />0^ <br />16.67 <br />Total Task Hours: <br />282.67 <br />Net Job Hours: <br />156.05 <br />Task description: Job Superintendent <br />Site: Bear Mine <br />NET JOB HOURS AND SUPERINTENDENT COST <br />PROJECT IDENTIFICATION <br />Task #: 015 State: Colorado <br />Date: 7/1/2011 County: Gunnison <br />User: SLB <br />Agency or organization name: DRMS <br />TASK LIST (Conversion of Total Task Hours to Net Job Hours) <br />Permit Action: NA - New CIRCES <br />Program Rollover Permit/Job #: C1981033 <br />Net Hours to Task Hours Percentage: 55.21% <br />JOB SUPERINTENDENT COST/HOUR <br />Superintendent's vehicle description: Light Duty Pickup, 4x4, 1 T. Crew <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown: <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Operator Cost/Hour: <br />Total Unit Cost/Hour: <br />$4.33 <br />$16.58 <br />$39.53 <br />$60.44 <br />Utilization % <br />NA <br />100 <br />NA <br />Abbreviation: None <br />Filename: CO33 -015 <br />JOB TIME AND COST <br />Total job time: 156.05 Hours Total job cost: $9,432.00 <br />