Laserfiche WebLink
Mobilization Worksheet Cont'd Task # 14B <br />EQUIPMENT HAUL DISTANCE and Time <br />Nearest Major City or Town within project area region: GRAND JUNCTION <br />Total one -way travel stance: 120.00 miles <br />Average Trave Speed: 45.00 mph <br />Transportation Cycle Time: <br />Haul Time (Hours): <br />Return Time (Hours): <br />Loading Time (Hours): <br />Unloading Time (Hours): <br />Subtotals: <br />JOB TIME AND COST <br />Total Non - Roadable Mob/Demo l Cost * <br />`* two round trips with haul rig: <br />Total Roadable Mob/Demob Cost ** <br />** one round trip, no haul rig: <br />Non- Roadable <br />Equipment <br />2.67 <br />2.67 <br />2.00 <br />1.00 <br />8.33 <br />Total <br />Roadabl <br />Equipment <br />2.67 <br />2. 7 <br />N <br />NA <br />5.33 <br />Total <br />'oil time: <br />$13,529.95 <br />$0.00 <br />job cost: $13,529.95 <br />16.67 Hours <br />Page 2 of 2 <br />CIRCES Cost Estimating Software <br />