My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-09-16_REVISION - C1981033 (9)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981033
>
2011-09-16_REVISION - C1981033 (9)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:43:12 PM
Creation date
9/19/2011 1:28:21 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981033
IBM Index Class Name
REVISION
Doc Date
9/16/2011
Doc Name
Proposed Decision Letter
From
DRMS
To
Gunnison County Clerk and Recorder
Type & Sequence
SI1
Email Name
JJD
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BULLDOZER RIPPING WORK <br />Task description: Rip /scarify replaced topsoil <br />Site: Bear Mine <br />PROJECT IDENTIFICATION <br />Task #: 07B <br />Date: 7/1/2011 <br />User: SLB <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Ripper Attachment: <br />Cost Breakdown: <br />Area: <br />Cat D3G XL - 3P <br />3 -Shank Ripper <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Ripper Operating Cost/Hour: <br />Operator Cost/Hour: <br />Total Unit Cost/Hour: <br />JOB TIME AND COST <br />Fleet size: 1 Grader(s) <br />Unit cost: $173.853 Per acre <br />Permit Action: NA - New CIRCES <br />Program Rollover Permit/Job #: C1981033 <br />State: Colorado <br />County: Gunnison <br />Agency or organization name: Division of Reclamation, Mining and Safety <br />$11.18 <br />$21.39 <br />$1.77 <br />$38.49 <br />$72.83 <br />Horsepower: 70 <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Utilization % <br />NA <br />100 <br />100 <br />NA <br />Abbreviation: None <br />Filename: CO33 -07b <br />Total Fleet Cost/Hour: $72.83 <br />MATERIAL QUANTITIES Selected estimating method: Area <br />Alternate Methods: <br />Seismic: NA Bank Volume: NA BCY NA <br />Area: 7 acres Rip Depth (ft): 1.00 Volume: 11,745 BCY or CCY <br />Source of estimated quantity: Division estimate <br />HOURLY PRODUCTION <br />Seismic: <br />Seismic Velocity: <br />Average Ripping Depth: <br />Average Ripping Width: <br />Average Ripping Length: <br />Average Dozer Speed: <br />Average Maneuver Time: <br />Production per unit area: <br />Job Condition Correction Factors <br />NA feet/second <br />1.00 mph <br />5.08 degrees <br />100.00 feet <br />88.00 feet <br />0.25 feet <br />0.505 acres /hour <br />Unadjusted Hourly Unit Production: 0.505 Acres /hr <br />Site Altitude: 6,000 feet <br />Altitude Adj: 1.00 (CAT HB) <br />Job Efficiency: 0.83 (1 shift/day) <br />Net Correction: 0.83 multiplier <br />Adjusted Hourly Unit Production: 0.42 Acres/hr <br />Adjusted Hourly Fleet Production: 0.42 Acres /hr <br />Total job time: 17.38 Hours <br />Total job cost: $1,266.00 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.