Laserfiche WebLink
Bulldozer Worksheet Cont'd Task # 007 Page 2 of 2 <br />Dozing method: <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />Adjusted unit production: 104.81 LCY /hr <br />Adjusted fleet production: 104.81 LCY /hr <br />JOB TIME AND COST <br />Fleet size: <br />Unit cost: <br />Total job time: <br />Total job cost: <br />Net correction: 0.3369 <br />1 Dozer(s) <br />$1.448/LCY <br />53.67 Hours <br />$8,146.72 <br />1.000 <br />1.000 <br />0.830 <br />0.600 <br />1.000 <br />1.000 <br />0.902 <br />1.000 <br />(GEN.) <br />(AVG.) <br />(1 SHIFT/DAY) <br />(END-SF) <br />(CAT HB) <br />(CAT HB) <br />(CAT HB) <br />(PAT) <br />CIRCES Cost Estimating Software <br />