Location <br />This Week <br />(tons) <br />Cumulative <br />(tons) <br />Comments <br />DCF Process <br />0 <br />300,251 <br />Total <br />0 <br />300,251 <br />ame <br />and compaction was achieved using a 10 -ton vibratory smooth drum compactor. Nuclear <br />density testing, moisture verification, and depth check testing was performed with results <br />within project specifications. Test locations were surveyed by Ames. <br />D) High Volume Solution Collection System <br />1) High Volume Solution Collection Piping <br />Placement of the high volume collection system continued at the DCF placement area shown <br />on Figure 5, advancing in front of the placement. CPeP was placed and sandbagged in <br />accordance with design drawings and project specifications. <br />2) Drain Cover Fill (DCF) <br />No placement performed during the week (see Figure 5 for previous DCF placement). <br />Finishing of previously hauled DCF was performed using various CAT dozers and was <br />observed by AMEC representatives. <br />Haul routes used for DCF placement on the east crest of the PSSA were ripped using an Ames <br />CAT D -6 dozer, preparing for ore placement in the area. The area was surveyed by Ames and <br />any area within 10' of the geomembrane was ripped by Ames to a depth of 18- inches. An <br />AMEC representative was observed the scarification. <br />E) Leak Detection Trench <br />1) VLF <br />A portion of the leak detection system was installed between stations J13 +00 ( + / -) and J15 +50 <br />( + / -), approximately 100 feet right of centerline. The 1'xl' trench was excavated using a CAT <br />312 excavator. Leak detection trench construction was observed and inspected by an AMEC <br />field representative and found to be constructed in accordance with design drawing and project <br />specifications. <br />II) Storm Water Management <br />A) Best Management Practices <br />Best Management Practices are being observed throughout the Phase 5 VLF Project. <br />III) Material Processing <br />A) Drain Cover Fill Process Area <br />No work performed during the shift. <br />VLF Weekly Report WE 09.03.2011 <br />