Location <br />This Week <br />(tons) <br />Cumulative <br />(tons) <br />Comments <br />DCF Process <br />29,303 <br />293,860 <br />Total <br />29,303 <br />293,860 <br />D) High Volume Solution Collection System <br />1) High Volume Solution Collection Piping <br />Placement of the high volume collection system continued at the DCF placement area shown <br />on Figure 5, advancing in front of the placement. CPeP was placed and sandbagged in <br />accordance with design drawings and project specifications. <br />2) Drain Cover Fill (DCF) <br />Drain cover fill (DCF) placement within the Phase 5 VLF continued. DCF was placed in the <br />areas shown ,on Figure 5. The DCF was hauled from the processing area to the placement area <br />using 40 -ton articulating haul trucks. The DCF was placed in a 2 -foot lift using various CAT <br />dozers except where haul routes were established. Haul route consisted of five -foot lifts to be <br />spread into 2 -foot lifts later. Laborers were present at all times during placement holding the <br />high volume collection piping in place, removing debris /sandbags, and assisting the dozer <br />operator with lift thickness. All DCF was placed on previously approved primary <br />geomembrane. AMEC field representatives monitored the DCF placement constantly. <br />E) Leak Detection Trench <br />1) VLF <br />A portion of the leak detection system was installed between stations E22 +80 ( + / -) to E23 +10 <br />( + / -) approximately 100 left of centerline and between stations A37 +00 ( + / -) and A41 +00 <br />( + / -), approximately 250 feet left of centerline. The 1'xl' trench was excavated using a CAT <br />312 excavator. 40mil HDPE geomembrane and 12oz /ft geotextile were placed in the trench. <br />Three -inch CPe pipe was then placed over the geotextile. Approved leak detection fill (LDF) <br />was placed in the trench using a skid steer loader and laborers. The geotextile was wrapped and <br />overlapped, encapsulating the LDF and 3" CPe pipe. SLF material was then placed over the <br />trench. Near station E23 +00 ( + / -), the leak detection was placed under the anchor trench. A <br />SLF plug was also placed under the anchor trench encapsulating a 3" SDR 13.5 solid HDPE <br />pipe. The transition between CPe and solid pipe was performed using a 3" split coupler. Leak <br />detection trench construction was observed and inspected by an AMEC field representative and <br />found to be constructed in accordance with design drawing and project specifications. <br />II) Storm Water Management <br />A) Best Management Practices <br />Best Management Practices are being observed throughout the Phase 5 VLF Project. <br />III) Material Processing <br />A) Drain Cover Fill Process Area <br />Processing of Drain Cover Fill (DCF) continued at the DCF process area using a dozer. <br />ame0 <br />VLF Weekly Report WE 08.20.2011 <br />