My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-09-09_REVISION - M1981185 (43)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1981185
>
2011-09-09_REVISION - M1981185 (43)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:58:17 PM
Creation date
9/12/2011 12:15:04 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981185
IBM Index Class Name
REVISION
Doc Date
9/9/2011
Doc Name
Response to Fifth Adequacy Letter
From
R Squared, Inc.
To
DRMS
Type & Sequence
CN1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Wallace H. Erickson <br />Response to August 23, 2011 Bird Memorandum <br />September 9, 2011 <br />Page 6 <br />dissolved solids using a method set forth in Actlabs geochemistry /assay and geometallurgy <br />protocols (www.actlabs.com) and approved by DRMS. <br />Adequacy Issue No. D. Attachment D -8, Whole Rock Sampling and Kinetic Testing <br />Work Plan <br />1) For all solids tests (e.g., SPLP, humidity cell, acid -base accounting, <br />whole rock analyses, solution characterization methods), the Applicant <br />must commit to consulting with the Division prior to the tests to <br />determine appropriate sampling and analytical parameters, including, but <br />not limited to, what is regarded as a representative sample, the <br />appropriate analytical suite for each test, and laboratories that are <br />qualified to perform the tests. <br />2) ABA: In addition to total sulfur all tests must include sulfide sulfur. <br />3) Humidity Cell Test: Collection of sample material for the tailings <br />humidity cell test must be done with the DRMS geochemist present. The <br />humidity cell test must be conducted under the conditions outlined in the <br />Division's adequacy review of 25 March 2011, i.e., the test must be run <br />indefinitely or until notified otherwise by the division and the analyte list <br />must be as described in the 25 March 2011 review. <br />Response to Adequacy Issue No. D. <br />Response to Adequacy Issue No. D.1. <br />Wildcat commits to consulting with DRMS for all solids tests (e.g., SPLP, <br />humidity cell, acid -base accounting, whole rock analyses, solution characterization <br />methods) prior to the tests to determine appropriate sampling and analytical parameters, <br />including, but not limited to, what is regarded as a representative sample, the appropriate <br />analytical suite for each test, and laboratories that are qualified to perform the tests. <br />Response to Adequacy Issue No. D.2. <br />Wildcat will include sulfide sulfur in the ABA protocol which also quantifies AP, <br />NP, Net NP, paste pH and acid soluble sulfate and sulfide. <br />Response to Adequacy Issue No. D.3. <br />Wildcat will collect sample material for the tailings humidity cell test with the <br />DRMS geochemist present. Wildcat will conduct the humidity cell test under the <br />conditions outlined in DRMS' March 25, 2011 adequacy review, i.e., the test will be run <br />indefinitely or until notified otherwise by DRMS, and the analyte list will be as <br />described in the March 25, 2011 review. <br />DEN 97,591,783v2 9 -9 -11 <br />GREENBERG TRAURIG, LLP • ATTORNEYS AT LAW • WWW.GTLAW.COM <br />
The URL can be used to link to this page
Your browser does not support the video tag.