My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-09-09_REVISION - M1981185 (43)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1981185
>
2011-09-09_REVISION - M1981185 (43)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:58:17 PM
Creation date
9/12/2011 12:15:04 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981185
IBM Index Class Name
REVISION
Doc Date
9/9/2011
Doc Name
Response to Fifth Adequacy Letter
From
R Squared, Inc.
To
DRMS
Type & Sequence
CN1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Wallace H. Erickson <br />Response to August 22, 2011 Hays Memorandum <br />September 9, 2011 <br />Page 13 <br />CLC Associates - Wildcat Mining Corporation — Construction Plans <br />Adequacy Issue No. 24. <br />General Note #3 on the CLC cover sheet states the contractor shall have a copy of the <br />approved geotechnical report for access road design and compaction requirements. <br />Please confirm the Applicant is referring to the geotechnical report based on the <br />additional geotechnical investigation (Question #6 above). <br />Response to Adequacy Issue No. 24. <br />Wildcat will clarify General Note #3 on the CLC cover sheet to confirm the <br />contractor shall have a copy of the approved geotechnical report for access road design <br />and compaction requirements based on the additional geotechnical investigation detailed <br />in the Pre - Construction Activities section at Page 5 of the New Access Road <br />Construction Work Plan. As explained in Response to Adequacy Issue No. 6, Wildcat <br />will commit to submitting the new geotechnical investigation information, with the <br />revised road design if required, for DRMS review and approval through either the <br />Technical Revision or Amendment process prior to commencing access road <br />reconstruction activities. <br />Adequacy Issue No. 25. <br />Please correct the Matchline Station labeling error in the profile section on Sheet C4.12. <br />Response to Adequacy Issue No. 25. <br />Wildcat has corrected the Matchline Station labeling error on Sheet C4.12. The <br />Matchline Station on the left -hand side of Sheet C4.12 should refer to Matchline Station <br />17 +00, and not Matchline Station 14 +00. <br />Adequacy Issue No. 26. <br />Please define the abbreviations used by CLC Associates (i.e. BVCE, BVCS, VC, PVI, <br />A.D., K,) in the access road construction plans. <br />Response to Adequacy Issue No. 26. <br />The abbreviations used by CLC are as follows: <br />DEN 97, 591, 784v1 9 -9 -11 <br />1. BVCE = Begin Vertical Curve Elevation <br />2. BVCS = Begin Vertical Curve Station <br />3. EVCE = End Vertical Curve Elevation <br />4. EVCS = End Vertical Curve Station <br />5. VC = Vertical Curve <br />GREENBERG TRAURIG, LLP • ATTORNEYS AT LAW • WWW.GTLAW.COM <br />
The URL can be used to link to this page
Your browser does not support the video tag.