Mr. Wallace H. Erickson <br />Response to Fifth Adequacy <br />September 9, 2011 <br />Page 11 <br />• Recycled process water storage tanks <br />• Tailings disposal and/or storage locations <br />• Sump or pit to contain leachate from stacked tailings <br />The Applicant submitted design specifications certified by a licensed professional <br />engineer for two of the four Zircon units indentified as Environmental Protection <br />Facilities. The Applicant did not provide the specifications required by Rules 6.4.21(10) <br />and 6.4.21(7)(a) for the mill building, two of the four Zircon units, tailings dewatering <br />location, pipelines for transport of tailings and recycled process fluids, storage tanks for <br />recycled process fluids, and the tailings disposal location. <br />Please address the requirements of Rules 6.4.21(10) and 6.4.21(7). <br />Response to Adequacy Issue No. 6. <br />Wildcat is submitting conceptual design specifications and modifying Exhibit U (EPP) <br />for the requested EPP structures as follows: <br />• Mill building. <br />o Wildcat has shown the mill building on maps at Exhibit U, Figure D -1 <br />(Environmental Protection Plan); and, Attachment D -2, Figures D -1 (May <br />Day No. 1 Surface Facilities) and D -2 (May Day No. 1 Portal Repair and <br />Stormwater Control Plan). Wildcat is submitting revised maps and additional <br />conceptual diagrams showing Existing Mill Structures and a Conceptual Mill <br />Schematic at the May Day No. 1. See Attachment 3 (Attachment D -2, <br />Figures D -1 (May Day No. 1 Surface Facilities); Attachment D -2, Figure D -2 <br />(May Day No. 1 Portal Repair and Stormwater Control Plan); Attachment D- <br />2, Figure D -1A (May Day No. 1, Existing Mill Structures) & Attachment D- <br />2, Figure D -1B (Conceptual Mill Schematic); Figure D -2). <br />o Wildcat will modify the Design Specifications, Designated Chemical <br />Storage, May Day No. 1 Affected Area section at Page 18 of Exhibit U, by <br />adding the following language to the end of the "Mill building" bullet: <br />DEN 97,599,531v1 9 -9 -11 <br />• Wildcat will implement the following sub -work plan during <br />implementation of the Portal Collapse Repair Work Plan, Attachment D- <br />2, to develop design specifications, to construct and to obtain licensed <br />professional engineer certification of the mill building as an <br />Environmental Protection Facility: <br />GREENBERG TRAURIG, LLP • ATTORNEYS AT LAW • WWW.GTLAW.COM <br />