My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-08-30_APPLICATION CORRESPONDENCE - C2010088
DRMS
>
Day Forward
>
Application Correspondence
>
Coal
>
C2010088
>
2011-08-30_APPLICATION CORRESPONDENCE - C2010088
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:42:45 PM
Creation date
9/12/2011 11:04:33 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010088
IBM Index Class Name
APPLICATION CORRESPONDENCE
Doc Date
8/30/2011
Doc Name
Cost Estimate
From
DRMS
Email Name
JRS
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0.750 <br />(AVG.) <br />0.900 <br />(CAT HB)) <br />1.000 <br />(GEN.) <br />1.000 <br />(AVG.) <br />0.830 <br />(1 SHIFT/DAY) <br />1.000 <br />(DOZ -OC) <br />1.000 <br />(CAT HB) <br />1.000 <br />(CAT HB) <br />0.793 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Bulldozer Worksheet Cont'd <br />Job Condition Correction Factor <br />Operator Skill: <br />Material consistency: <br />Dozing method: <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />Net correction: 0.4443 <br />Adjusted unit production: 404.54 LCY /hr <br />Adjusted fleet production: 404.54 LCY /hr <br />JOB TIME AND COST <br />Fleet size: <br />Unit cost: <br />Total job time: <br />Total job cost: <br />1 Dozer(s) <br />$0.546/LCY <br />3.17 Hours <br />$699.24 <br />Task # 033 <br />Source <br />Page 2 of 2 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.