Laserfiche WebLink
Task description: <br />Site: Fruita Loadout <br />Cost Breakdown: <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Ripper op. Cost/Hour: <br />Operator Cost/Hour: <br />Total unit Cost/Hour: $220.73 <br />Total Fleet Cost/Hour: $220.73 <br />MATERIAL QUANTITIES <br />Initial Volume: 1,100 <br />Swell factor: 1.165 <br />Loose volume: 1,282 LCY <br />HOURLY PRODUCTION <br />Average push distance: 150 feet <br />Average push gradient: <br />Average site altitude: <br />Material weight: 2,9001bs /LCY <br />Regrade Light -Use Road #2 <br />PROJECT IDENTIFICATION <br />Task #: 033 State: Colorado Abbreviation: None <br />Date: 30- Aug -11 County: Mesa Filename C088 -033 <br />User: JRS <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D9R - 9SU (2005) <br />Horsepower: 405 <br />Blade Type: Semi - Universal <br />Attachment: 1 -shank ripper <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />$58.82 <br />$117.89 <br />$5.53 <br />$38.49 <br />Source of estimated volume: Division of Reclamation, Mining & Safety; Map 15 <br />Source of estimated swell factor: Cat Handbook <br />Unadjusted hourly production: 910.5 LCY /hr <br />BULLDOZER WORK <br />Materials consistency description: Compacted fill or embankment 0.9 <br />0% <br />4,500 feet <br />Weight description: Decomposed rock - 50% Rock, 50% Earth <br />Permit Action: New Permit Permit/Job #: C2010088 <br />Utilization % <br />NA <br />100 <br />50 <br />NA <br />Page 1 of 2 <br />CIRCES Cost Estimating Software <br />