My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-09-09_APPLICATION CORRESPONDENCE - C2010089 (2)
DRMS
>
Day Forward
>
Application Correspondence
>
Coal
>
C2010089
>
2011-09-09_APPLICATION CORRESPONDENCE - C2010089 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:43:02 PM
Creation date
9/12/2011 11:04:23 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010089
IBM Index Class Name
APPLICATION CORRESPONDENCE
Doc Date
9/9/2011
Doc Name
Preliminary Adequacy Review No. 2
From
DRMS
To
Western Fuels Association, Inc
Email Name
SB1
MLT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C- 2010 -089 PAR No. 2 <br />New Horizon North Mine <br />DRMS: A reference was added as requested. Please change the font for the section header <br />to Bold, consistent with the format of the surrounding paragraphs. <br />2. 2.05.3(6) also addresses the requirements for temporary overburden disposal (storage) <br />structures. Please note that the proposed overburden stockpile must comply with the <br />applicable performance standards of Rule 4.09.1. Please revise the PAP to address these <br />requirements. <br />DRMS: We have not yet conducted a thorough review of the information provided. <br />3. Subsection 2.05.3(6)(a) Overburden Blasting has been provided with the application. The <br />Division has no comments regarding this section at this time. <br />4. Response accepted. <br />2.05.4 — Reclamation Plan <br />2.05.4(2)(a) — Reclamation timetable <br />1. Response accepted. <br />2.05.4(2)(b) — Reclamation cost estimate <br />1. Response accepted. The Division's RCE will be included when it is completed. <br />2.05.4(2)(c) — Backfilling, soil stabilizing, compacting, grading, post- mining contours, stream <br />channel reconstruction, and road removal or modification <br />1. Response accepted. <br />2. Response accepted. <br />3. Response accepted. <br />4. Three cross sections have been provided on Map 2.05.4 -1, depicting the pre - mining ground <br />surface and the proposed post- mining surface. <br />a) Response accepted. <br />b) Please incorporate an additional line into each of the sections which depicts the <br />anticipated limits of the mining - related excavation. <br />DRMS: The Division's question could have been better worded. Please illustrate, <br />across each cross section, the location of the anticipated pit floor. <br />5. Response accepted. <br />2.05.4(2)(d) — Removal, storage and redistribution of topsoil and subsoil <br />1. Response accepted. <br />2. Response accepted. <br />3. Please provide an explanation of how mixing topsoil and subsoil together complies with <br />section 34- 33- 120(2)(e) of the Act. <br />9- Sep -2011 <br />Page 19 of 25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.