C- 2010 -089 PAR No. 2 <br />New Horizon North Mine <br />9- Sep -2011 <br />Page 17 of 25 <br />b) In Table 2 on page 4 of the Arcadis report in Appendix 2.05.3(4) -1, a primary discharge <br />pipe length of 247 feet is given for sediment pond NHN -002. However, referring to <br />Figure 3 of the same report, the pipe length appears to be about 60 feet. Please clarify. <br />14. Response accepted. <br />15. Response accepted. <br />16. Response accepted. <br />17. The Sedcad designs contain two runs for the "Collection Ditch Design for Pond NHN -002 <br />South ". The first design run appears to have used parameters from the previous run for <br />"Collection Ditch Design for Pond NHN -002 North ". Please eliminate the incorrect Sedcad <br />design run for NHN -002 South. <br />DRMS: The Division has no further concerns with this question. The first design run was <br />removed in the May 26, 2011 submittal. However, the Division has additional questions <br />concerning culverts and ditches. <br />a) The Sedcad hydrology design for Channel -1 consists of one ditch design page that is <br />located at the back of Appendix 2.05.3(3) -1, "Sedcad Runs for Culverts ". Please include <br />additional design pages that show how the peak discharge for Channel -1 was obtained, <br />as was done for the other ditches. Also, in order to avoid any confusion, please consider <br />moving the channel -1 Sedcad run pages to a more appropriate section, such as <br />Appendix 2.05.3(4) -2, "Sedcad Runs for Pond and Diversions ". Also, please consider <br />adding Channel -1 to Table 4: Ditch Design Parameters on page 7 of Appendix <br />2.05.3(4) -1, "Arcadis Report on Sediment Control ". <br />b) In Appendix 2.05.3(3) -1, "Sedcad Runs for Culverts ", there are Sedcad design sheets <br />for culvert C -1 that use a peak discharge of 4.78 cfs and a culvert diameter of 18 inches. <br />These parameters also appear in the Culvert Table on Map 2.05.3(3) -1 for that culvert. <br />However, directly after those design pages is one design page for culvert C -1 that uses a <br />peak discharge of 51.82 cfs. Please explain. <br />c) The Culvert Table on Map 2.05.3(3) -1 states that the subwatersheds for culvert C -13 are <br />SW1 -B and SW -FA. However, referring to Map 2.05.3(3) -1, it appears that the <br />subwatersheds should be SW -1C and SW -FA. If this is correct, please revise the Sedcad <br />designs and the Culvert Table on Map 2.05.3(3) -1 for culvert C -13. <br />d) Please add the D50 riprap size of.6 inches for ditch NHN -002 South w /Riprap to Table <br />4: Ditch Design Parameters on page 7 of Appendix 2.05.3(4) -1, "Arcadis Report on <br />Sediment Control ". <br />18. Response accepted. <br />19. As was done for the curve number of 91 on the second page of the Pond Design Memo in <br />Appendix 2.05.3(3) -1, please justify the use of the curve number of 79 for the subwatersheds <br />for culverts C -6 and C -6A. <br />DRMS: In the May 26, 2011 submittal cover letter, Western Fuels explained the <br />justification for using the curve number but did not revise any text since the culvert was not <br />in the mine's disturbed area. The Division's question could have been worded better. The <br />justification for the curve number of 91, used in the Sedcad design runs for all mine <br />disturbed area ponds, ditches and culverts, appears on page 2 of Appendix 2.05.3(4) -1. <br />