My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-09-09_APPLICATION CORRESPONDENCE - C2010089 (2)
DRMS
>
Day Forward
>
Application Correspondence
>
Coal
>
C2010089
>
2011-09-09_APPLICATION CORRESPONDENCE - C2010089 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:43:02 PM
Creation date
9/12/2011 11:04:23 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010089
IBM Index Class Name
APPLICATION CORRESPONDENCE
Doc Date
9/9/2011
Doc Name
Preliminary Adequacy Review No. 2
From
DRMS
To
Western Fuels Association, Inc
Email Name
SB1
MLT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C- 2010 -089 PAR No. 2 <br />New Horizon North Mine <br />9- Sep -2011 <br />Page 14 of 25 <br />4. As required under Rule 2.05.3(4)(a)(i)(B) and Rule 2.10(2), please provide certified cross <br />sections of each sediment pond, oriented both lengthwise and widthwise and which include <br />each primary discharge structure. <br />DRMS: In the submittal dated May 26, 2011, a revised Arcadis report with the requested <br />cross sections was provided in the renamed Appendix 2.05.3(4) -1. However, the Division <br />has additional questions based on this recent submittal of the pond cross sections. <br />a) There does not appear to be a discussion in the permit application concerning the <br />construction methods that will be used for the three sediment ponds. Rule <br />2.05.3(4)(a)(ii)(B) requires construction specifications for the sediment ponds in order <br />to ensure that the factor of safety has been met. Please revise the permit text, perhaps in <br />Section 2.05.3(4) or Appendix 2.05.3(4) -1, to include a description of the construction <br />techniques that will be used for building the sediment ponds, pond embankments and <br />pond discharge structures. <br />b) Please add a discussion in the permit application as to whether any of the proposed <br />sediment ponds can be classified as having Class B or Class C dams, as defined in the <br />U.S. Department of Agriculture, Soil Conservation Service Technical Release No. 60 <br />"Earth Dams and Reservoirs ", October, 1985. If any of the sediment ponds can qualify <br />as having a Class B or Class C dam, please revise the permit application to demonstrate <br />compliance with those Rules which apply to Class B or Class C dams. <br />c) As required under Rule 4.05.9(8)(a) or (b), please revise the permit application after <br />construction of the three sediment ponds to include the appropriate geotechnical <br />demonstrations that the applicable factor of safety required under Rule 4.05.9(8)(a) or <br />(b) had been achieved for each sediment pond embankment. <br />d) Appendix 2.05.3(4) -1, "Arcadis Report on Sediment Control ", contains cross sections <br />for the three sediment ponds. The cross sections show that ponds NHN -001 and NHN - <br />003 will have 10 foot wide embankment tops. However, the cross section for pond <br />NHN -002 shows that it will have a 5 foot wide embankment top. The Division is <br />concerned, especially since a public road is adjacent to the length of the pond, that such <br />a narrow embankment may not be stable enough to achieve the applicable factor of <br />safety. The Division requests that the permit application designs be revised to show that <br />the embankment top width for pond NHN -002 will be at least 10 feet. <br />e) The proposed sediment pond embankment heights, measured from the pond bottom to <br />the emergency spillway bottom, are listed in Table 3 and shown on the cross sections, in <br />Appendix 2.05.3(4) -1. The proposed embankment heights for ponds NHN -001 and <br />NHN -003 are less than 10 feet but for pond NHN -002, the proposed embankment <br />height is 11.5 feet. Rule 4.05.9(6) requires a foundation investigation for those pond <br />embankments that exceed 10 feet in height. Please provide the foundation investigation <br />required under Rule 4.05.9(6) or lower the height of the pond embankment for NHN - <br />002 to 10 feet or less. <br />f) The certified pond cross sections in the Arcadis report in Appendix 2.05.3(4) -1 show <br />that the pond embankment inslopes and outslopes for sediment ponds NHN -002 and <br />NHN -003 are both 2H:1 V. However, Rule 4.05.9(7)(e) requires that the combination of <br />the inslope and outslope of a pond embankment not be steeper than 5H:1 V unless a <br />demonstration is provided to show that the steeper slopes will be stable. Please provide <br />
The URL can be used to link to this page
Your browser does not support the video tag.